Laserfiche WebLink
� � �. <br /> \� <br /> � O�1 <br /> ;_:; _ ��7��.' of UR�l�'� <br /> � �Y�.�:%5�:�',N7�'� ',� /^� <br /> ����'c �,+.•� �~, •�• �, Municipal Of6ces <br /> ,.�f,;�. <br /> .'� � .t;'`i s, ;:`;,.;j�`l; h, � <br /> �.,.�. <br /> '�` r �:� � ��� � Mailing Address: <br /> ��.'� ���`";;�;;`�i�"�`i;t?k�• G � Street Address: <br /> �.�.., ,� �.r��:.;; f. ;�, P.O. Box 66 <br /> `•��.. A�• �•-�'����¢�;' 2750 Kelley Parkway , <br /> �:;. ESK ;" Crystal Bay, MN 55323•0066 <br /> �� Orona, MN 55356 <br /> To: The Cun-ent Owner of Address � � � l'��e �'n'`� "�'� <br /> City Ordinance requires that onsite sewage treatment systems in Orono be <br /> inspected on a periodic basis. The.onsite sewaje treatment system at the above <br /> address has been inspected and the following is known about tlle system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Healtl� Threat <br /> Yes <br /> No � <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be brou;ht into compliance <br /> within 90 days. Failure to do so will result in refenal to the City Attorney for <br /> legal action. <br /> System Ident' ed as Non-Compliant <br /> Yes <br /> No <br /> If yes, system must be brought into compliance by: <br /> December 31,2007 � � <br /> December 31, 2010 <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tank be serviced and pumped <br /> out every three years. City records indicate the tank(s) were last pumped out on <br /> c�_ �� ��"" . The tank(s) should be cleaned through the mailhole ar�d <br /> not through the inspection pipes, tlus allows for proper cleanin�. <br /> Comments: <br /> � �.� <br /> Inspector: Date of Inspection � C� <br /> Telephone l9�Zj 24�-464U ° Fax (9�21249-4616 <br />