My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-P11229 - new septic
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
310 Hollander Road - 25-118-23-43-0010
>
Septic
>
2007-P11229 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:28 PM
Creation date
2/24/2017 2:45:38 PM
Metadata
Fields
Template:
x Address Old
House Number
310
Street Name
Hollander
Street Type
Road
Address
310 Hollander Road
Document Type
Septic
PIN
2511823430010
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1'UMl' S�L�C:'1'lUN PROCEDUI�E <br /> � 1. Determine pump capacity: <br />, A. Gravity distribution <br /> 1. Minimum required discharge is 10 gpm <br /> 2. Maximum suggested discharge is 45 gpm. For other <br /> establishments at least 10°!o greater than the water supply rate, <br /> but no faster than the rate at which effluent will flow out of the <br /> distribution device. <br /> �. 1'ressure dista�ibution <br /> See pressure distribution work sheet <br /> From A or B Selected pump capacity: �t �gpm wr�� <br /> 2. Deterrnir�e pump head requirements: <br /> A. Elevation difference between pump and point of discharge? so�heatrnent systerr <br /> )a feet &point of discharge <br /> q.�•.��r• /J D.i <br /> B.Special head requirement? (See Figure at right -Special Head Requirements) total pipe <br /> feet 1e�� <br /> � inlet � �•elevation <br /> G Calculate Fricdon Ioss p�� difference <br /> ------- -- - <br /> 1. Select pipe diame#er �.0 in �--���--��-���-��•-- �� <br /> --------�------------------ ------ �d�! <br /> 2. Enter Figure E-9 with gprn(IA or B) and pipe diameter(Cl). <br /> Read friction]oss in feet per 100 feet from Figure E-9 Special Head Requirements <br /> Friction Loss = 3,a� ftJ100ft of pipe Gravity Distribution 0 ft <br /> 3. Determine total pipe lengtlt from pump discharge to soil treatment Pressure Distribution 5 ft <br /> discharge point. Estimate by adding 25 percent to pipe length for <br /> fitting loss. Total pipe length times 1.25=equivalent pipe length E-9: Frlction Loss in Plastic Pipe <br /> 1 t�c� feet x 1.25 = �OJ feet <br /> Per l d0 teet <br /> 4. Calculate total friction loss by multiplying friction loss (C2) nominai <br /> in ft/100 ft by the equivaler�t pipe length(C3)and divide by 100. pipe diameter <br /> = 3.a� ft/loofr x ��o =100-�_ft flow rate l.s" 2" 3" <br /> - pm <br /> D. Total head required is the sum of elevation difference(A),special 2� 2.41 0.73 0.11 <br /> head requirements(B), and total friction loss(C4) 25 3.73 1.11 0.16 <br /> 1� ft+ ft+�_ft= 30 5.2:3 1.55 0.23 <br /> T�tal heac�: � � feet 35 6.9a 2,ob o.30 <br /> 40 8.9 I 2.64 0.39 <br /> 3. Ptlrilp SeleCtiorl 45 11.07 3.28 0.48 <br /> 50 13.46 3.99 0.58 <br /> / v►'tta-'`�. 55 4J6 0.70 <br /> A pump must be selected to deliver at least�� �,pm bp 5.60 0.82 <br /> (lA or B) with at least /`y feet of total head (2D) 65 6.48 0.95 <br /> 70 7.44 1.09 <br /> I hereby certify that I�ve completed this work in accordance with applicable ordinanees, rules and laws. <br /> , <br /> � �' ��� �•��---- (signature) ��/y (license#) _ 4-��-v 7 (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.