Laserfiche WebLink
. ' <br /> �7-P TEST�/YV� �N ,�i. Steven B. Schirmers • MPCA Cert.No. 627 <br /> 951 Katydid Lane NE • St. Michael, MN 55376 • (763) 497-356fi <br /> FAX (763) 497-5011 <br /> ,iz / �� � � � �� 2 � ,��� State License #394 <br /> +�:�'�i''E���R�1Vf� <br /> April 30, 2007 ��� � ���l <br /> �SPEC C3k, R�-!" <br /> bATE ' � � FE�1V(�T PJO.,,�,,,�,,,,,,,,,�,,,,,,, <br /> �trnov��s svs:�[t�rF.p' <br /> APPROYED WITH CORRECYtONB iVDTED <br /> Jim Sidman l3QTAPPROVED-CORRfiCT�it�tlT <br /> 310 Hollander Rd. Th��°°���s�fo�y�,*�++rofinet��. Aft vbixx be done ���T��"Q� <br /> in full compliaaae with e1!applicabte septic and zon�� <br /> Orono, Henn. Co., M�� RequiremeniatncludingitemsnotspecificallynoteJinthfa'�View; <br /> KEEP THIS PLAN S&T ON SITE AT ALL'tIMBS / `� <br /> f° <br /> This site has an existing on-site sewage treatment system on record at the City of <br /> Orono for being non-c.ompliant. <br /> This On-Site Sewage Treatment System is Designed for a Type 1, four bedroom home, <br /> in accordance with the� Minnesota Pollution Control Agency Chapter 7080 and local <br /> ordinances. <br /> The soils on this site �ire a loam. The mottled soils were located at 66" & 74" (redox <br /> features). The bottom of the treatment area must be located at least 3' above the redox <br /> features. A standard trench system may be installed. <br /> All property lines are �pproximate & must be located prior to installation. <br /> The soils at a depth of 30" have a percolation rate of 30.0 mpi. <br /> A pumping chamber w�ill need to be installed to iift the septic effluent to the treatment <br /> area. The power supply and switches must be located outside the manhole and <br /> pumping chamber in a weather proof enclosure. A warning device must be installed <br /> with a light and sound device, this is in case of a pump failure. <br /> The supply line will neE:d to be installed through a low drainage swale which will require <br /> the 1 st 80' to be install��d as a force main with the remaining 80' having backdrainage. <br /> The 1st 20' must be insulated. <br /> � ��`. , �l���� <br /> �C�t�t'�DP'�' ����� <br />