My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2005-P08908 - septic
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
280 Hollander Road - 25-118-23-43-0012
>
Septic
>
2005-P08908 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:15:34 PM
Creation date
2/24/2017 1:32:32 PM
Metadata
Fields
Template:
x Address Old
House Number
280
Street Name
Hollander
Street Type
Road
Address
280 Hollander Road
Document Type
Septic
PIN
2511823430012
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� i • r� PUMP SELECTION PR4C�DURE <br /> 1. Determine pump capacity: <br /> �,,A. Gravity distribution <br /> ' 1. Minimum required discharge is 10 gpm . <br /> 2. Maximum suggested discharge is 45 g�m. For other <br /> establishments at least 10%greatei than the water supply rate, <br /> but no faster than the rate at which effluent will flow out of the <br /> distribution device. - <br /> B. Pressure distribution <br /> See pressure distribution work sheet <br /> From A or B Selected pump capacity: 4� gpm <br /> 2. Determine pump head requirements: <br /> A. Elevation difference between pump and point of discharge? so�treatment system <br /> & int of discharge <br /> 1�,_feet a;.:.�>., 1`S <br /> B. Special head requirement?(See Figure at right-Special Head Requirements) �nal pipe <br /> 9 <br /> �_feet 2A.elevation <br /> fnlet difference <br /> C. Calculate Friction loss P�pe <br /> ------- -- - <br /> 1. Select pipe diameter � in """"--��" " <br /> .......................... .......�o� <br /> 2. Enter Figure E-9 with gpm(lA or B)and pipe diameter(Cl). <br /> � Read friction loss in feet per 100 feet hom Figure E-9 Special Head `Requirements <br /> Friction'Loss= �/F � ft/100ft of pipe Gravity Distribution 0 ft <br /> 3. Determule total pxpe length from pump discharge to soil treatment ?ressure Distribution 5 ft <br /> discharge point.Estimate by adding 25 percent to pipe length for <br /> fitting lvss.Total pipe length times 1.25=equivalent pipe length E-9:Frictlon loss in Plastic Pipe <br /> 7� feet x 1.25 = 4 � feet Per 100 teet <br /> 4.Calculate total fricdon loss by multiplying friction loss(C2) nominal <br /> in ft/100 ft,by.the equivalent:pipe length(C3) and divide by 100. pipe diameter <br /> = 3 •V ft/100ft x �6�f +100= � ft flow rate 1.5" 2" 3" <br /> m <br /> ' D. Total head required is the sum of elevaHon difference(A),special 20 2:47 0.73 0.11 <br /> head requirements(B);and total friction loss (C4) 25 3J3 1.11 0.]6 <br /> t�-I ft+ 5 ft+�_ft= , 30 5.23 1.55 0.23 <br /> 35 6.96 2.06 0.30 <br /> Total head: a� feet - � ao s.9� 2.ba o.39 <br /> 3. Purnp selection as �i.oz s 28 o.as <br /> 50 13.46 3.99 0.58 <br /> 55 4J6 0.70 <br /> A pump must be selected to deliver at ieast�.gpm - bp 5.60 0.82 <br /> (1A or B)with at least�_feet of total head (2D) �,5 6.48 0.95 <br /> 70 • 7'.44 1.09 <br /> I hereby certify that I h ve completed this work in accordance with applicable ordinances, :rules and laws. <br /> . � (signature) 3'?�-I (license#) �� "�`��oJ' (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.