Laserfiche WebLink
� � �`��� <br /> . <br /> o'��. <br /> o. . ,, <br /> � ' ��'�� of �R�l�� <br /> :;.; . <br /> �.;a.s;:'��:, _. <br /> 1�i r�'t 7 <br /> �-�, �:- '�''' MunicipalOffices <br /> � � i•il�,.� <br /> ���'C� f5°jI�"�Fr�'?��xra�''��?�.� ��� Street Address: Mailing Address: <br /> •.,. ' �,.,�.}, ; <br /> ��..;�<q ����'��'''�'� �¢ '% 2750 Kelley Parkway P.O. Box 66 <br /> �;• kESYiO i' Crystal Bay, MN 55323•0066 <br /> � Orono, MN 55356 <br /> To: The Cunent Owner of Address � �� i'� � � �'�� �� <br /> City Ordinance requires that onsite sewage t�eatment systems in Orono be <br /> inspected on a periodic basis. The onsite sewa?e treatment system at the above <br /> address has been inspected and tl�e following is known about the system. A <br /> sketch of the known components of the system is available for most properties at <br /> the Orono City Hall. <br /> Imminent Public Healtla Threat <br /> Yes <br /> No <br /> If yes, please contact the Onsite Systems Manager at 952-249-4626 within 10 <br /> days of receipt of this notice. The septic system must be bzoujht into compliance <br /> within 90 days. Failure to do so will result in referral to the City Attorney for <br /> legal action. <br /> System Identified as 1\Ton-Compliant <br /> Yes �No <br /> If yes, system must be brought into compliance by: <br /> December 31, 2007 � <br /> December 31, 2010 . <br /> Other <br /> Septic Tank(s) Pump out Needed <br /> Yes �No <br /> The City recommends the septic tank(s) and/or lift tanl�be serviced and pumped <br /> out everv three�ears. City records indicate the tank(s) were last pumped out on <br /> `� - ,� C:� J . The tanl:(s) should be cleaned throuah the manhole and <br /> not through the inspection pipes, tlus ailows for proper cleaning. <br /> Comments: � <br /> w• <br /> ,.�,�� ,� :��,��� Date of Inspection � '� � � <br /> Inspecto�. � <br /> Telephone 19�2) 249-460U • Fa� (9�2 i 249-4616 <br />