My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2004-P07178 - mechanical
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
225 Hollander Road - 25-118-23-44-0007
>
Permits/Inspections
>
2004-P07178 - mechanical
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:12 PM
Creation date
2/22/2017 11:24:19 AM
Metadata
Fields
Template:
x Address Old
House Number
225
Street Name
Hollander
Street Type
Road
Address
225 Hollander Road
Document Type
Permits/Inspections
PIN
2511823440007
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br /> s <br /> � <br /> � <br /> � CITY OF ORONO APPLICATION FOR 11�CHANICAL PERMIT <br /> � Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mai(or in person at the City offices. Applications�vill be <br /> reviewed and a permit will be issued within two working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECENE A PERNIIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical Desi�ns-Complete calculations, details and specifications are required for each heating, <br /> ventilation, hum�idification-dehumidification, and air conditioning installation including heat loss/heat <br /> gain calculation, design temperatures, equipment ratings and identification as to type, manufacturer and <br /> model. Data shall be presented on form provided. Identification of and specifications for water heating <br /> equipment sliall also be provided. <br /> 4. When any ne�v construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code <br /> requirements. <br /> 6. All work must be inspected(rough-in and final). Call (952) 249-�600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions <br /> Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call <br /> (952) 249-4600. <br /> Please check one: ❑ New ❑ Addition ❑ Repair ❑ Replace �Residential ❑ Commercial <br /> . � <br /> ,1 :. , <br /> JOB SITE: .�, � 1+� �" � -� ' (.;� Zi <br /> � p: ;�.����'� I <br /> Owner's Name: ` � Phone Number: <br /> Mailing Address: ��,�1L1-�� � �"; , .�� �.i. City: Zip: <br /> , : <br /> :� ��,� ��� � � � �j �x ' .�` <br /> Contractor's Name: ���` iPhone umber: � �~I � � `(���`�-(..c j�C�'� <br /> Mailing Address: � (�, ` -��� �� ��'� City:;_�a- ��t.�,_ � ��"'��' Zip: �-<�< i _ � <br /> � <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.