Laserfiche WebLink
Monitoring Plan <br /> Owner: <br /> Thomas& Laura Clapp <br /> 215 Hollander Road <br /> Orono,MN 55391 <br /> Location: <br /> Same <br /> Maintainer: <br /> Chip's Septic Service LLC. <br /> Pernel Chip Hentges <br /> 16762 Babcock Ave. <br /> Lester Prairie,MN 55354 <br /> 952-200-3176 <br /> The owner has an Subsurface Septic Treatrnent System(SSTS),that is considered a Type <br /> 3 under the rules of MPCA. The SSTS system consists of the following: (2) 1500-gallon <br /> septic tanks, (1) 1500 gallon pump tank, and an above grade Mound Drainfield,with a 10 <br /> x 63 Rockbed. The new drainfield will be located on filled soils that will be removed <br /> prior to placement of the required 3 feet of sand under the rockbed. City requirements <br /> require that a monitoring and mitigation plan be developed. The first year monitoring <br /> will take place within the first 6 months of the installation, and then yeazly for 3 years. <br /> After that,the monitoring inspecrion will be completed with the routine maintenance of <br /> the tanks every 3 yeazs. A water meter will need to be installed and tied to the water use <br /> in the house,not the outside faucets. <br /> Component Service Needed Service Monitoring Monitoring <br /> Service Frequency Compliance Observation Compliance <br /> Level Frequency Level <br /> Flow None None (See Above) Less than <br /> 750 gpd <br /> Septic tanks Pump Complete (See Above) Sludge depth <br /> (every 3 years) Removal <than 12" <br /> Scum depth <br /> from Baffle <br /> � �3�, <br /> Pump tanks Pump Complete (See Above) None <br /> Every 3 years Removal check float <br /> Check floats Adjust floats <br />