My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01328 - septic
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
215 Hollander Road - 25-118-23-44-0013
>
Septic
>
2016-01328 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:20 PM
Creation date
2/22/2017 10:28:19 AM
Metadata
Fields
Template:
x Address Old
House Number
215
Street Name
Hollander
Street Type
Road
Address
215 Hollander Road
Document Type
Septic
PIN
2511823440013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
���;;. <br /> OSTP Mound Materials Worksheet UNIVERSITY <br /> Minnesota Pollution OF MINNESOTA ����� <br /> Control Agency '' <br /> ProjectlD: v 04.20.2016 <br /> A. Catculate Rock Volume:(Rock Below Pi e+Rock to cover i e iPe dia�f jnch/)X Bed Len th 2.D)X Bed Width (2.6)=Volume ft3 <br /> ( 12 in + 3 in)+12 62.5 ft X 10.0 ft = 781.3 ft3 <br /> Divide ft'by 27 ft'/yd'to calculate cubic rds: <br /> 781.3 ftl : 27 = 28.9 yd; <br /> Add 20%for constructabitity: Z$•9 yd3 X 1.2 = 34.7 yd' <br /> For systems using other distribution media-see product registration for material required <br /> B. Calculate Clean Sand Volume: <br /> Volume Under Rock bed:Average Sand Depth x Medta Width x Media Length =cubic feet <br /> 3.5 ft X 10.0 ft X 62.5 ft = 2187.5 ft3 <br /> For a Mound on a slope from 0-146 <br /> Volume from Length=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Length) <br /> 4.00 ft -1) X 8•50 X 62.5 ft = 1593.75 <br /> Volume from Width=((Upslope Mound Height-1)X Absorption Width Beyond Bed X Media Bed Width) <br /> 4.00 ft -1) X 8.50 X 10 ft = 255.00 <br /> Totol Clean Sand Volume:Volume from Length+Volume Jrom�dth+Volume Under Medio <br /> 1593.8 ft; + 255.0 ft3 + 2187.5 ft3 = 4036.3 {t3 <br /> For a Mound on a slope greater than t% <br /> Upslope Volume:((Upsfope Mound Height -1)x 3 x Bed Length)+2=cubic feet <br /> (( 5.0 ft -1) X 3.O ft X 62.5 )+2= 375.0 ft' <br /> Downslope Volume:((Downslope Heiqht- 1) x Downslope Absorption Width x Medio Lenqth)+2=cubic feet <br /> (( 6.0 ft-1) X 17.0 ft X 62.5 )+2= 2656.3 ft; <br /> Ends(ope Volume:(Downslope Mound Heiqht-1) x 3 x Media Width =cubic feet <br /> ( 6.0 ft-1 ) X 3.0 ft X 10.0 ft = 150.0 ft; <br /> Tota!Clean Sand Volume:Upsfope Volume +pownslope Volume +Endslope Volume +Votume Under Media <br /> 375.0 ft3 + 2656.3 ft3 + 150.0 ft3 + 2187.5 ft'= 5368.8 ft3 <br /> Divide ft'by 27 ft'/yd'to calculate cubic yards: 5368.8 ft3 = 27 = 1qg,8 yd3 <br /> Add 20%for construdability: 198•8 yd3 X 1.2 = 238.6 yd' <br /> C. Calculate Sandy Berm Volume: <br /> Total Berm Volume(approx):((Avg.Mound Height-0.5 ft topsoil)x Mound Width x Mound Length)}2=cubic feet <br /> ( 5.5 . 0.5 )ft X 64.3 ft X 119.6 )+2= 1 g234,9 ft3 <br /> Total Mound Volume-Clean Sand vo(ume-Rock Volume=cubic feet <br /> 19234.9 ft' - 5368.8 ft' - 781.3 ft3 = 13084.9 ft' <br /> Divide ft3 by 27 ft3/yd'to calculate cubic yards: 13084.9 ft' : 27 = 484.6 yd; <br /> Add 20%for constructability: 484.6 yd' x 1.2 = 581.6 yd' <br /> D. Calculate Topsoil Material Volume:Total Mound Width X Total Mound Length X.5 jt <br /> 64.3 ft X 119.6 ft X 0.5 ft = 3847.0 ft' <br /> Divide ft'by 27 ft3/yd;to calculate cubic yards: 3��•o ft3 = 27 = 142.5 yd3 <br /> Add 20%for construdability: 142.5 yd' x 1.2 = 171.0 yd' <br />
The URL can be used to link to this page
Your browser does not support the video tag.