My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-01328 - septic
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
215 Hollander Road - 25-118-23-44-0013
>
Septic
>
2016-01328 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:20 PM
Creation date
2/22/2017 10:28:19 AM
Metadata
Fields
Template:
x Address Old
House Number
215
Street Name
Hollander
Street Type
Road
Address
215 Hollander Road
Document Type
Septic
PIN
2511823440013
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
42
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• 5. DISTRIBUTION MEDIA: REGISTERED TREATMENT PRODUCTS: CHAMBERS AND EZFLOW <br /> A. Enter Dispersal Media: <br /> B. Enterthe Component: Length: �ft Width:�ft Depth:�ft <br /> C. Number of Components per Row= Bed Length divided by Component Length (Round up) <br /> � ft : � ft= C�components/row <br /> D. Actual Bed Length = Number of Components/row X Component Length: <br /> �components X �ft = �ft <br /> E. Number of Rows= Bed Width divided by Component Width (Round up) <br /> � ft= � ft= � rows Adjust width so this is an who(e number. <br /> F. Total Number of Components=Number of Components per Row X Number of Rows <br /> � X � - ��components <br /> 6. MOUND SIZING <br /> A. Calculate Minimum Clean Sand Lift: 3 feet minus Depth to Limiting Condition =Clean Sand Lift <br /> 3.0 ft - � ft = 3.0 ft Design Sand Lift(optional): �ft <br /> 6. Calculate Upslope Height: Clean Sand Lift + media depth +cover(1 ft.) = Upslope Height <br /> 3.0 ft + 1.0 ft + 1.0 ft= 5.0 ft <br /> C. Select Upslope Berm Multiplier (based on tand slope): 2.86 <br /> Land Slope 3'0 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Upslope Berm 3:1 3.00 2.91 2.83 2.75 2.68 2.61 2.54 2.48 2.42 2.36 2.31 2.26 2.21 <br /> Ratio 4:1 4.00 3.85 3.70 3.57 3.45 333 3.23 3.12 3.03 2.94 2.86 2.78 2.70 <br /> D. Calculate Upslope Berm Width: Multiplier X Upslope Mound Height =Upslope Berm Width <br /> 2.86 ft X 5.0 ft = 14.3 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width X Land Slope= 100= Drop (ft) <br /> 10.0 ft X 10.0 % : 100= 1.00 ft <br /> F. Calculate Downslope Mound Height: Upslope Height+ Drop in Elevation = Downslope Height <br /> 5.0 ft + 1.00 ft = 6.0 ft <br /> G. Select Downslope Berm Multiplier(based on land slope): 6.67 <br /> Land Slope% 0 1 2 3 4 5 6 7 8 9 10 11 12 <br /> Downslope 3:1 3.00 3.09 3.19 3.30 3.41 3.53 3.66 3.80 3.95 4.11 4.29 4.48 4.69 <br /> Berm Ratio 4:1 4.00 4.17 4.35 4.54 4.76 5.00 5.26 5.56 5.88 6.25 6.67 7.14 7.69 <br /> H. Calculate Downslope Berm Width: Multiplier X Downslope Height = Downslope Berm Width <br /> 6.67 x 6.0 ft = 40.0 ft <br /> I. Calculate Minimum Berm to Cover Absorption Area: Downslope Absorption Width +4 feet <br /> 17.0 ft +� ft = 21.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 40.0 ft <br /> K. Select Endslope Berm Multiplier: 4.76 (usua!(y 3.0 or 4.0) <br /> L. Calculate Endslope Berm X Downslope Mound Height = Endslope Berm Width <br /> 4.76 ft X 6.0 ft = 28.6 ft <br /> M. Catculate Mound Width: Upslope Berm Width + Bed Width + Downslope Berm Width <br /> 14.3 ft + 10.0 ft + 40.0 ft = 64.3 ft <br /> N. Calculate Mound Length: Endslope Berm Width + Bed Length + Endslope Berm Width <br /> 28.6 ft + 62.5 ft + 28.6 ft = 119.6 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.