My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-00124 - septic
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
205 Hollander Road - 25-118-23-44-0011
>
Septic
>
2008-00124 - septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:16 PM
Creation date
2/22/2017 9:00:57 AM
Metadata
Fields
Template:
x Address Old
House Number
205
Street Name
Hollander
Street Type
Road
Address
205 Hollander Road
Document Type
Septic
PIN
2511823440011
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- . PUMP SELECTION PROCEDURE <br />.. . <br /> � 1., Determine pump capacity: <br /> A. Gravity distribution <br /> 1. Minimum required discharge is 10 gpm <br /> 2. Maximum suggested discharge is 45 gpm. For other <br /> establishments at least 10°/o greater than the water supplv rate, <br /> but no faster than the rate at which effluent will flow out of the <br /> distribution device. <br /> B. Pressure distribution <br /> See pressatre distribiction zvork sJzeet <br /> From A or B Selected pump capacity: `�'7' gpm <br /> 2. Determine pump head requirements: <br /> A. Elevation difference between pump and point of discharge? soil treotment system <br /> &point of discharge <br /> / � feet � a�Qa���e� <br /> B. Special head requirement? (See Figecre at right- Specic�l Hend Reqi�irements) totol pipe <br /> length <br /> S feet iNet�� ' ZAdifference <br /> G Calculate Friction loss pipe;; i;� <br /> � ------- <br /> ._ �_ <br /> � <br /> 1. Select pipe diameter �--� in ;�����������-������- ��� <br /> �- ; <br /> 2. Enter Figr.�re E-9 with gpm (lA or B) and pipe diameter (C1). "" ' "•° •" ` <br /> Read friction loss in feet per 100 feet from Fibaure E-9 Speciai Head Requirements <br /> Friction Loss= 3 -99 ft/100ft of pipe Gravity �istribution 0 ft <br /> 3. Determine total pipe length from pump discharge to soil treatment Pressure Distribution 5 ft <br /> discharge point. Estimate by adding 25 percent to pipe length for <br /> fitting loss. Total pipe length times 1.25 = equivalent pipe length <br /> E-9: Friction loss in Piastic Pipe <br /> �_feet x 1.2� = s g feet <br /> Per 100 feet <br /> 4.Calculate total friction loss by multiplying friction loss (C2) nominal <br /> in ft/100 ft by the equivalent pipe length(C3) and divide by 100. pipe diameter <br /> = 3.! ft/100ft x 3� =100 = � ft fl pmrate 1.5" 2" 3" <br /> D. Total head required is the sum of elevation difference (A), special 2� 2.47 0.73 0.11 <br /> head requirements (B), and total friction loss (C4) 25 3.73 1.l 1 0.16 <br /> � S ft+ S ft+ Z ft= 30 5.23 1.55 023 <br /> Total head: �� feet 35 6.96 2.06 o.so <br /> 40 8.91 2.64 0.39 <br /> 3. Pump selection a5 >>.o� C� o.as <br /> 50 13.46 3.99 0.58 <br /> 55 4.76 0.70 <br /> A pump must be selected to deliver at least�gpm 60 5.60 0.82 <br /> (lA or B)with at least '�feet of total head (2D) 65 6,48 0.95 <br /> 70 7.44 1.09 <br /> I hereby certify t have c m eted this work in accordance with applicable ordinances, rules and laws. <br /> (signature) `� (license#) ��� ��� (date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.