My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
land use info
Orono
>
Property Files
>
Street Address
>
H
>
Hollander Road
>
200 Hollander Road - 25-118-23-44-0015-HISTORICAL FILE
>
Land Use
>
land use info
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 4:16:25 PM
Creation date
2/21/2017 12:16:11 PM
Metadata
Fields
Template:
x Address Old
House Number
200
Street Name
Hollander
Street Type
Road
Address
200 Hollander Road
Document Type
Land Use
PIN
2511823440015
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�O� <br /> O : O <br /> i� =,.�x �:-.;:y CITY o� ORONO <br /> 1� ��, r��• ��� � � <br /> v,� ����� �`��,,�� !Gr Municipal Offices <br /> `� �� t 3:��t��:`�`�G~ Street Address: MailinQ Addrou: <br /> ��;gg04' 2150 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> October 18, 2000 <br /> John Hollander <br /> 200 Hollander Road <br /> Wayzata, MN 55391 <br /> Dear Mr. Hollander: <br /> An inspection of your septic system was conducted on October 3, 2000. A summary of the inspection <br /> is below. <br /> Septic Tank Condition <br /> 1. Pumpout needed within one year(last pumpout date 9/11/87). <br /> The septic system is non-compliant due to a lack of a three foot separation distance between the bottom <br /> of the drainfield to the seasonally high watertable. The three foot requirement is a State Code,not a City <br /> Code. A soil boring was conducted to determine the depth of the seasonally watertable. The septic <br /> system must be replaced by December 31,2010. <br /> Enclosed is a list of state licensed septic contractors who work in Orono on a regular basis. Also <br /> enclosed is a fact sheet explaining how a septic system functions properly. Finally, an as-built drawing <br /> is enclosed that shows the approximate location of the septic system. <br /> If you have any questions regazding this report, please contact me at the Ciiy Offices at 249-4600. <br /> Re pectfull , <br /> y� <br /> Chris Penc�e" <br /> On-Site Systems Manager <br /> Enclosures <br /> In the event this inspection report is used to satisfy the requirements for a mortgage or other transfer of property,be <br /> advised that this report does no guarantee or certify the egisting system will continue to function properiy,but is <br /> merely an opinion of the adequacy of the system under current conditions based on the available information. <br /> This report must be kept on the premises with the system location and pumping records. <br /> Telephone(952)249-4600 • Fax(952)249-4616 <br /> www ci.orono.mn.ns <br />
The URL can be used to link to this page
Your browser does not support the video tag.