Laserfiche WebLink
1 <br /> � <br /> � <br /> , � ,,� <br /> *Insulation ��j�' 4 1'�'` /�N� <br /> -Re insulate any and all walls that are opened to meet code. � --�--�'"� <br /> *Cabinets (Supplied by Sawhill) <br /> -Install cabinets—base vanity cabinets,medicine cabinets,toilet cabinet and linen <br /> cabinet. Adjust and insta.11 moldings and hardware to the same. <br /> *Tops (Lav tap by Sawhill) <br /> *Tile <br /> 1. Bath Floor <br /> -Pour a new 3/.."minimum floated floor or 5/8"Dura-rock to allow for new tile. <br /> -Supply and set 12"X 12"floor tile to entire bath floor. <br /> (Tile: Kate-Lo#30053)Set floor tile at a diagonal. <br /> -Grout new tile and seal grout. <br /> -Install 4" base of same tile to perimeter. <br /> 2. Shower Floor <br /> -Pour a new'/,minimum floated floor with rubber pan to shower floor. <br /> -Supply and set 2" S 2"tile to the shower floor and bench. (Tile: Rubble#DOS). <br /> -Grout new tile and seal grout. <br /> 3. Shower Walls <br /> -Supply and install dura-rock tile backer to all walls and ceiling at shower. <br /> -Supply and install 3/4"mosaic tile to ceiling and walls. (Tile: Kate-Lo glass mosaic <br /> tile "TD-229). <br /> -Tile entire north wall around medicine cabinets form top of vanity to ceiling. <br /> -Grout new tile and seal grout. <br /> *Millwork <br /> -Re use existing as possible. (Door, door t�im, window, window trim). Suppiy and <br /> install new as necessary. Tnstall an access panel ta the hallway, finish to match <br />