My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-01228 - new structure
Orono
>
Property Files
>
Street Address
>
H
>
Highwood Road
>
4174 Highwood Road - 07-117-23-44-0026
>
Permits/Inspections
>
2014-01228 - new structure
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:40:20 PM
Creation date
2/16/2017 12:06:27 PM
Metadata
Fields
Template:
x Address Old
House Number
4174
Street Name
Highwood
Street Type
Road
Address
4174 Highwood Rd
Document Type
Permits/Inspections
PIN
0711723440026
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, « <br /> Erosion Control Sunplemental Information <br /> �nal Stabilization will be provided with(seed, sod, etc): S�'� <br /> and 6 inches of topsoil will be added/replaced prior to final stabilizarion. <br /> Concrete Washout: Location of concrete washout <br /> =Off site �Indicated on site plans _Other(descriprion): �No concrete washout: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater,of all vegetation to be retained. <br /> �Yes _Not Applicable _Other(description}: <br /> Inspections: An erosion control inspection plan is required for all projects disturbing'/4 acre or <br /> greater. The inspection requirements are as follows: <br /> 1) The i�Tdividual iclentified as being responsible for implementifzg the erosron conri•ol <br /> plan must routinely inspect the construcdion site once every seven days during acti►�e <br /> conshuctiott and tivithin 2�hours after-a rainfall event greater•than 0.5 inches in 24 <br /> lzours. <br /> 2) All inspections and muintenance conducted during construction must be recol-ded in <br /> wrin'ng and tJzese�-ecords must be retairred►�=ith the erosron control plan and made <br /> available at the Distr•ict's request within 2=1 hours.Records of eacl:inspection and <br /> maintenance activi.ry shall include: <br /> i. Date and time of inspections; <br /> ii. Na�ne nf person conducting ir�spections; <br /> iii. Findings of inspections,including recornmendations for corrective actions; <br /> iv. Corrective actions taken(including dates,times and party completing <br /> rnainterzance activities);rznd <br /> }�. Date and a�nount of al1 rai�afall events greater than 0.5 inches in 2�hours. <br /> Provide the following inforrnation for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name ��3 l.c��ti <br /> Organization �L C«r,��rue�u,n, 'L1 L <br /> Phone ��C Z-353 - �l S�� Alternate Phone <br /> Email _C�e„5�n C� CNt Ccrns�-x►�e.�-�.c�n.� <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> _ � ?� �� <br /> Signature of AppIicant or Authorized Agent Date <br />
The URL can be used to link to this page
Your browser does not support the video tag.