Laserfiche WebLink
, « <br /> Erosion Control Sunplemental Information <br /> �nal Stabilization will be provided with(seed, sod, etc): S�'� <br /> and 6 inches of topsoil will be added/replaced prior to final stabilizarion. <br /> Concrete Washout: Location of concrete washout <br /> =Off site �Indicated on site plans _Other(descriprion): �No concrete washout: <br /> Vegetation: Protective fencing will be installed as necessary so as to exclude all fill and equipment <br /> from the drip line or critical root zone,whichever is greater,of all vegetation to be retained. <br /> �Yes _Not Applicable _Other(description}: <br /> Inspections: An erosion control inspection plan is required for all projects disturbing'/4 acre or <br /> greater. The inspection requirements are as follows: <br /> 1) The i�Tdividual iclentified as being responsible for implementifzg the erosron conri•ol <br /> plan must routinely inspect the construcdion site once every seven days during acti►�e <br /> conshuctiott and tivithin 2�hours after-a rainfall event greater•than 0.5 inches in 24 <br /> lzours. <br /> 2) All inspections and muintenance conducted during construction must be recol-ded in <br /> wrin'ng and tJzese�-ecords must be retairred►�=ith the erosron control plan and made <br /> available at the Distr•ict's request within 2=1 hours.Records of eacl:inspection and <br /> maintenance activi.ry shall include: <br /> i. Date and time of inspections; <br /> ii. Na�ne nf person conducting ir�spections; <br /> iii. Findings of inspections,including recornmendations for corrective actions; <br /> iv. Corrective actions taken(including dates,times and party completing <br /> rnainterzance activities);rznd <br /> }�. Date and a�nount of al1 rai�afall events greater than 0.5 inches in 2�hours. <br /> Provide the following inforrnation for the primary individual responsible for implementing the erosion <br /> control plan: <br /> Name ��3 l.c��ti <br /> Organization �L C«r,��rue�u,n, 'L1 L <br /> Phone ��C Z-353 - �l S�� Alternate Phone <br /> Email _C�e„5�n C� CNt Ccrns�-x►�e.�-�.c�n.� <br /> I certify that I am familiar with the requirements of the MCWD Erosion Control Rule and that the <br /> proposed activity will be conducted in compliance with this rule. <br /> _ � ?� �� <br /> Signature of AppIicant or Authorized Agent Date <br />