Laserfiche WebLink
Andrew Mack <br /> From: Andrew Mack <br /> Sent: Thursday, November 13, 2014 2:36 PM <br /> To: 'ccasey@cncconstruction.org' <br /> Cc: Christine Mattson; Lyle Oman <br /> Subject: FW: 2014-01228 -4174 Highwood Road <br /> 1. The silt fence and rock construction entrance should be installed and inspected by the City prior to any <br /> land disturbing activities. The Contractor must provide a minimum 24 hour notice prior to inspection. <br /> 2. Additional grading detail should be provided along the west property line to define a swale that directs <br /> runoff north and south and not onto the adjacent property. Additional spot elevations and proposed <br /> contours should be added as necessary to adequately define the swale. <br /> 3. A financial security of$2,500 from the Applicant is recommended for erosion control and engineering <br /> oversight. The financial security is intended to provide protection in the event that it becomes <br /> necessary for the City to install or maintain erosion and sediment control within the project area and <br /> covers the cost of vegetation re-establishment if the applicant is unable to follow through with the <br /> conditions of approval. <br /> 4. The applicant may be required to obtain Minnehaha Creek Watershed District (MCWD) approval and <br /> permitting for their Erosion Control rule. A copy of any approved permit or confirmation that no <br /> permit is required should be submitted prior to any land altering activities. <br /> Andrew Mack, AICP <br /> r'r�i�4'�:��, Community Development Director <br /> � City of Orono Minnesota <br /> � Direct 952.249.4626 <br /> ��_��� amackCcilci.orono.mn.us <br /> www.ci.orono.mn.us <br /> 1 <br />