Laserfiche WebLink
� � � � � � � � � � � � � � � ��� <br /> LAKE AND LAND �URVEYING, INC. <br /> 1200 Centre Pointe Curve, Suite 275 <br /> Mendota Heights, Minnesota 55120 . <br /> Phone: 651-776-6211 - <br /> 1 . Sequence of Erosion Control Construction Activities � <br /> a) Installation of silt fence prior to any construction activity. <br /> 1MRE AIESH REINFORCEMENT <br /> �"'"°""" b) Installation of rock constructicn entrance prior to any construction activity. <br /> ENqNEERING FABRIC <br /> MET,�� ,� c) The site shall be re—vegetatecl within 48 hours of final grading. <br /> POST OR STAKE <br /> d) Install landscaping as per landscape plan with all disturbed areas having a minimum of 6 inches of topsoil. <br /> FABRIC ANCHORAGE <br /> TRENCH BACKFlLL Wlhl <br /> TAMPED NATURAL SOIL <br /> 2. Erosion and Sediment Control Measures <br /> DIREC'n�� . . , .,�.�'..::;_ AII best management practices (E3MPS) determined by the Engineer to be effective are available for use <br /> R�N� ;., ".;B.INcN,'AI�fMVJ�'. <br /> ::��{;;A,��;�;:;:�,�:. . . on the site. BMPs anticipated to be used on the Project include the following: <br /> �`�� . . - * Silt Fence <br /> * Rock Construction Entrance <br /> CONSTRUCTION OF SILT FENCE * Concrete Mixing/Washout Basins shall be offsite <br /> * Final Landscaping with Seed, Fertilizer, Topsoil or Sod <br /> * Street Sweeping <br /> 3. Inspection and Maintenance <br /> The Contractor is responsible for providing, maintaining and removing all Erosion Control BMPs, as set <br /> �o��j a forth above, which includes all materials, equipment and labor. <br /> ��QJO�,�G Owner is responsible for having tfie Contractor install, maintain and remove the BMPs as set forth above. �� <br /> so O <br /> _ �'.��.`?000 �ii,�y � <br /> Gy O , <br /> Z <br /> GEOTECHNICAL FABRIC � O j � <br /> BELOW ROCK �o� <br /> 2" OR GREATER WASHED ,°°�r, � � <br /> ROCK AGGREGATE °o�°°�,o" \ '�� � o <br /> 6" MINIMUM DEPTH �oP��,�,oJ�� '� � � � � <br /> O � <br /> � �" ,� � I certify that this survey, plan or report was prepared by m� <br /> TEMPORARY ROCK CONSTRUCTION SITE ENTERANCE PAD � o � or under my direct supervision, and that I am a duly Registered <br /> z � Q Engineer and Land Surveyor under the laws of the State of Minnesota. <br /> n Rev December 11, 2014 <br /> Rev November 26, 2014 <br /> Rev October 20, 2014 <br /> Jonathan L. Faraci October 8, 2014 <br /> Registered Land Surveyor & Registered Engineer <br /> Minnesota Registration No. 16464 <br /> �D��Di ��/ �i�� �����-� <br />