My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09-22-2008 Council Packet
Orono
>
City Council
>
1950-2024
>
2000-2009
>
2008
>
09-22-2008 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 3:11:03 PM
Creation date
4/8/2015 3:06:12 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
206
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, September 8, 2008 <br />7:00 o’clock p.m. <br />___________________________________________________________________________________ <br />____________________________________________________________________________ <br />PAGE 5 of 12 <br />(4. #08-3370 BARB AND KEVIN DULIN WITH J. SVEN GUSTAFSON OF STONEWOOD, <br />LLC, 1785 CONCORDIA STREET, Continued) <br /> <br />Dulin stated they are relocating the residence further back and are attempting to fit the structure inside <br />what would be a reconstructed buildable area. They are 4.5 percent over on the hardcover in the 75-250 <br />foot zone and under on the structural coverage. <br /> <br />Gustafson noted there is a city fire lane located on the property and that they have spoken with the City <br />about whether they would be able to use that land to help create a swale and correct the drainage on the <br />property. Gustafson commented it was his impression that the Planning Commission was in favor of <br />allowing the use of the fire lane to correct the drainage. <br /> <br />White noted the applicant should have been able to remove the ice ridge a while ago. <br /> <br />Dulin stated he would like to do that at the same time as the floodplain work since both projects would <br />require heavy equipment. <br /> <br />McMillan asked whether rip-rap would be placed along the shoreline. <br /> <br />Dulin stated it would be. <br /> <br />McMillan recommended the applicants give some consideration to plantings to help with erosion. <br /> <br />Dulin stated they would need to tear up the shoreline to remove the ice ridge and that they would look <br />into different options for that area. <br /> <br />McMillan asked whether the Minnehaha Creek Watershed District would need to approve this plan. <br /> <br />Dulin stated he has not submitted his plan to the MCWD at the present time. <br /> <br />McMillan stated in her view the floodplain work is the most important and that perhaps approval from <br />the MCWD should have been obtained first. <br /> <br />Turner pointed out that typically the MCWD requires city approval prior to granting its approval. <br /> <br />Rahn asked what portion of the pool would be considered hardcover. <br /> <br />Turner stated the entire pool would be considered hardcover. <br /> <br />Rahn asked whether the house would be constructed right up to the sewer easement. <br /> <br />Dulin stated it would be approximately five to seven feet away from the sewer easement. <br /> <br />Rahn suggested the house be located closer to the sewer easement to help decrease the hardcover. <br /> <br />Turner stated the driveway apron and the approach would be shifted backwards as well, and if it could <br />be shifted eight or ten feet, they would lose approximately 80 square feet of hardcover. <br /> <br />Dulin stated they will locate it as far back as possible. <br />Item #02 - CC Agenda - 09/22/08 <br />Approval of Council Minutes 09/08/08 [Page 5 of 12]
The URL can be used to link to this page
Your browser does not support the video tag.