Laserfiche WebLink
CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID <br /> UNTIL YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS <br /> POSTED ON THE JOB SITE. <br /> 3. Mechanical Desi�ns - Complete calculations, details and specifications are required for each heating, <br /> ventilation,humidification-dehumidification, and air conditioning instaliation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be vrovided. <br /> 4. When any new construction or remodeling is involved, a separate building pernut must be obtained. <br /> 5. All work must be done in accordance wirh the Uniform Mechanical Code/State Buiiding Code <br /> requirements. <br /> 6. All work must be inspected (rough-in and final). Call 473-7357. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before fmal. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 473-7357. <br /> Please check one: New X Addition Repair Replace <br /> � Residential Commercial <br /> JOB STTE: L�l �� J-} 1 G�1,�.'G��'l� /�C�f�I� Q��(.1 f Zip: �,`J'�3�a� <br /> � Owner's Name: �Ep kGC F�PPc�8�-ccm Telephone Number: cja/—/�7l� <br /> Mailing Address: 5%�- City: Zip: <br /> Contractor'sName: BLAINE HTa. A/C t ELECT. INC• _ TelephoneNumber: 757—�+��J'D <br /> MailingAddress: �_M��WT_City: Zip: <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quan±it;�: � <br /> Make: 1g1�.�l/�1�,)� <br /> Model: �Sb I'I'IF�f�O�/Ce� <br /> Fuel: it1flT �S <br /> Flue Size: 3 '' <br /> Input BTUs: /00+ DOL� f'�= <br /> Output BTUs: ����'j'1_ <br /> CFM: /�SSD__ <br /> COOLING SYSTEMS <br /> Quantity: / <br /> Make: �21,/�1T <br /> Model: 2�ifa.�i9 �jL�. <br /> Tons: ,.3. .�-`� <br /> H. Power � <br /> �� � <br /> tl <br /> .� <br /> ���� <br />