Laserfiche WebLink
' Natiotlal Cor�crete Masonary Association Pa�e 10 of 10 <br /> Project Notes : <br /> See design cross section by MSE, dated 10-24-11. <br /> Soil Notes : <br /> Contractor shall verify soil parameters prior to and during construction. See design <br /> cross section by MSE, dated 10-24-11. <br /> Unit Notes : <br /> Contractor shall place drainage fill material in cores of block and to a minimum <br /> distance of 12"behind the block. Place a 4'strip of filter fabric at top of drainage <br /> zone. See design cross section by MSE, dated 10-24-11. <br /> file://C:AProgram Files\NCMA\SRWall 4.0\Report.html 10/24/20l 1 <br />