My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11-14-2011 Council Packet
Orono
>
City Council
>
2011
>
11-14-2011 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2015 11:51:48 AM
Creation date
4/8/2015 11:45:49 AM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
339
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, October 24, 2011 <br />7:00 o'clock p.m. <br />_____________________________________________________________________________________ <br /> Page 11 of 19 <br /> <br />PLANNING DEPARTMENT REPORT <br /> <br />10. #11-3526 3515 CAPITAL PARTNERS, LLC, 1545 MAPLE PLACE - PRELIMINARY <br />PLAT – RESOLUTION NO. 6089 <br /> <br />Curtis stated on Monday, October 10th the City Council reviewed this application to combine and plat the <br />existing six individual vacant lots south of 1545 Maple Place into three lots. The applicant and their <br />engineer have met with representatives from the MCWD. The determination was made that the project <br />will not be subject to regulation under the District’s Stormwater Management rule. An MCWD permit is <br />necessary for erosion control for disturbances which exceed 5,000 square feet or 50 cubic yards of <br />excavation or stockpiling. <br /> <br />The applicant is currently working with the City Engineer to finalize the proposed storm water facilities <br />for the regional drainage and for the property. The applicant has agreed to conduct the grading work to <br />create the storage swale on their property at their expense to accommodate the regional storm water <br />levels. The additional off-site work can be performed by the City’s Public Works staff at a reasonable <br />cost to the City. The money to fund this project would come from the Stormwater Fund. The final details <br />regarding storm water pond sizing and design will be completed prior to final plat approval. The <br />necessary easements will be granted by the applicant and reflected on the plat. <br /> <br />Staff recommends approval of the preliminary plat approval resolution based on the requirements in the <br />state statute regarding lot area and width, contingent on reaching a mutually beneficial resolution to the <br />storm water issues. It is the applicant’s current plan that a final plat application will be before the Council <br />at the November 14th meeting. <br /> <br />Due to approaching winter weather conditions and timing of final approvals, Staff recommends Public <br />Works and the City Engineer begin the planning process for the storm water improvements to be as <br />prepared as possible when the applicant receives approval and can begin their site work. The preliminary <br />work includes surveying and investigative work, right-of-way analysis, application for MCWD permits <br />and development of plans. <br /> <br />McMillan asked where the offsite storm water work would occur and whether it is on city-owned <br />property. <br /> <br />Curtis indicated it would be within the City’s right-of-way. They need to add a culvert, some additional <br />pipes, and enlarge them to discharge to Sandy Beach, where there is currently a stormwater discharge <br />location. <br /> <br />Amundsen stated due to the amount of water that flows to this property, they need to ensure that the water <br />can leave the property once the homes are constructed. This project is part of the comprehensive storm <br />water management plan and is identified as a project. Staff is working with the applicant on how homes <br />can be constructed in this area and how to create or facilitate regional drainage. The offsite pipe work <br />will guarantee proper drainage. <br /> <br />McMillan asked if the applicant's storm water fee would cover the cost of the work. <br /> <br />Amundsen indicated a lot of the design work is based on where the existing utilities are and further survey <br />work is required. The Public Works Department will be able to do the installation of the infrastructure so <br /> <br />Item #03 - CC Agenda - 11/14/2011 <br />Approval of Council Minutes 10/24/2011 [Page 11 of 19]
The URL can be used to link to this page
Your browser does not support the video tag.