Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, April 23, 2012 <br />7:00 o'clock p.m. <br />_____________________________________________________________________________________ <br /> <br /> Page 8 of 16 <br /> <br />(4. #12-3546 TODD HOLMERS ON BEHALF OF MAPLE PLACE, LLC, 1545 MAPLE <br /> PLACE, Continued) <br /> <br />Mattick asked whether the runoff would stay on that individual lot if they elect to apply for individual <br />building permits. <br /> <br />Holmers indicated he is not sure about that. <br /> <br />Mattick stated one of the reasons for a comprehensive grading plan was to avoid the need to control the <br />drainage on each specific lot. Staff has not looked at grading for this site on an individual lot basis and <br />that the required grading and fill for the entire site would exceed 500 cubic yards. <br /> <br />Bremer asked if plans have been drawn up for each lot and whether the drawing that has been presented <br />tonight is an actual drawing of the house that will be constructed. <br /> <br />Holmers indicated it is the actual drawing. <br /> <br />Bremer asked how many lots would have that type of home constructed on it. <br /> <br />Holmers indicated he is not sure at this time. Holmers stated they do have several different drawings but <br />that they have not gone further than that. <br /> <br />Bremer asked if the lots would be purchased prior to constructing the homes. <br /> <br />Holmers indicated they do have interest in a couple of the lots already. As it relates to the tree removal, <br />Holmers stated the last thing they wanted to do was clear the back half of the lots but that they did not <br />have a choice. Holmers indicated they do plan on bringing in some larger trees and that there will be <br />landscaping on the lots. <br /> <br />McMillan asked whether any landscaping will be done along the perimeter of the site. <br /> <br />Holmers indicated there would be and that they are attempting to resolve the ponding and grading before <br />the lots are landscaped. <br /> <br />Bremer asked what the status is of the silt fence. <br /> <br />Holmers stated the silt fence has been ordered. <br /> <br />McMillan asked what will happen to the existing house. <br /> <br />Holmers indicated that will be removed. <br /> <br />Rahn asked what the elevations are from the road to the garage floor. <br /> <br />Gaffron stated on Lot 9 the garage floor is 943' and the street is between 936' and 938', which would be <br />approximately a six-foot elevation over a space of 40 to 50 feet. <br /> <br /> <br />Item #03 - CC Agenda - 05/14/2012 <br />Approval of Council Minutes 04/23/2012 <br />[Page 8 of 16]