Laserfiche WebLink
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, August 12, 2013 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br />  <br />    Page 29 of 37   <br />(11. ORONO PUBLIC SCHOOLS – STOP SIGN REQUEST, Continued) <br /> <br />Struve indicated the Police Department as well as the Public Works Department can monitor it. Struve <br />indicated the first week of school likely will be pretty telling. <br /> <br />Anderson moved, Printup seconded, to install a stop sign at the north middle school entrance <br />making it a 4-way stop. VOTE: Ayes 5, Nays 0. <br /> <br />*12. WILLOW DRIVE RECONSTRUCTION PROJECT – PAY REQUEST NO. 2 <br /> <br />Anderson moved, Printup seconded, to approve Pay Request No. 2 for the contractor C.S. <br />McCrossan, in the amount of $510,967.29 for the Willow Drive reconstruction project. VOTE: <br />Ayes 5, Nays 0. <br /> <br />*13. 2013 SANITARY SEWER REHABILITATION PROJECT – PAY REQUEST NO. 1 <br /> <br />Anderson moved, Printup seconded, to approve Pay Request No. 1 for the contractor Visu-Sewer, <br />in the amount of $52,782.95 for the 2013 sanitary sewer rehabilitation project. VOTE: Ayes 5, <br />Nays 0. <br /> <br />*14. CARMEN BAY SHORELINE RESTORATION PROJECT – PAY REQUEST NO. 4 <br /> <br />Anderson moved, Printup seconded, to approve Pay Request No. 4 for the contractor Sunram <br />Construction, Inc., in the amount of $1,760.54 for the Carmen Bay shoreline restoration project. <br />VOTE: Ayes 5, Nays 0. <br /> <br />15. 2013 FORCEMAIN IMPROVEMENT PROJECT – BID AWARD <br /> <br />Struve stated at the June 10, 2013, City Council meeting, the Council approved a proposal from Bolton & <br />Menk for design services associated with the replacement of sanitary sewer forcemains on Tonkawa Road <br />and Rest Point Drive. The forcemain on Tonkawa is approximately 4,700 feet in total length and the Rest <br />Point forcemain is approximately 560 feet long. <br /> <br />A small portion of the Tonkawa forcemain was replaced in 2009 but there was another failure in 2011. <br />The proposed replacement section of the forcemain on Tonkawa has had five failures in the recent years <br />and is in need of replacement. This project is proposing replacing an additional 1,600 lineal feet of the <br />forcemain. In addition, the forcemain on Rest Point has had two failures in recent years. During the <br />repair in the fall of 2012, it was noted the condition of the forcemain has deteriorated to a point of <br />needing immediate attention or the City risks additional failures. <br /> <br />Bids were opened on August 6 and GL Contracting was the low bidder in the amount of $229,892.10. <br />This amount is approximately 13 percent below the engineering estimate for the project. Staff <br />recommends awarding the bid to GL Contracting in the amount of $229,892.10 rather than delay the <br />project any further. <br /> <br />McMillan asked if this road was identified in the City’s CIP. <br /> <br />Struve indicated it was not and was an item that was overlooked. <br />Item #02 - CC Agenda - 08/26/2013 <br />Approval of Council Minutes 08/12/2013 [Page 29 of 37]