My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05-28-2013 Council Packet
Orono
>
City Council
>
2013
>
05-28-2013 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2015 10:30:20 AM
Creation date
4/7/2015 1:47:30 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
251
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO CITY COUNCIL MEETING <br />Monday, May 13, 2013 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br /> Page 20 of 26 <br />(9. NAVARRE UPDATE, Continued) <br /> <br />Anderson stated that would be a good item to obtain public input on. <br /> <br />The City Council took no formal action on this item. <br /> <br />(A recess was taken from 9:00 p.m. to 9:05 p.m.) <br /> <br /> <br />PUBLIC WORKS DIRECTOR/CITY ENGINEER’S REPORT <br /> <br />*10. SAFE ASSURE COOPERATIVE SAFETY TRAINING <br /> <br />Anderson moved, Printup seconded, to approve the proposal from Safe Assure Consultants, Inc., <br />for conducting safety training and preparation of the related written programs and documentation <br />at an annual cost of $3,998. VOTE: Ayes 5, Nays 0 <br />*11. CHANGE TO 2013 GOLF COURSE FEE SCHEDULE <br /> <br />Anderson moved, Printup seconded, to approve a change to the 2013 fee schedule raising the senior <br />age limit from 55 years old to 60 years old. VOTE: Ayes 5, Nays 0. <br /> <br />12. WILLOW DRIVE STREET RECONSTRUCTION – BID AWARD <br /> <br />Struve noted at the January 14, 2013, City Council meeting, the Council approved a proposal from Bolton <br />& Menk for design services associated with the reconstruction of Willow Drive North between Kelley <br />Parkway and County Road 6, which is on the City’s Municipal State Aid system. <br /> <br />At the January 28, 2013, meeting, Bolton and Menk asked for direction from the Council for a few design <br />options and the Council approved the preliminary design at the March 11th meeting. Bids were received <br />on the plans and the low bidder was C.S. McCrossan. Bolton and Menk has submitted a proposal to <br />provide construction phase services for the Willow Drive Street Reconstruction project. <br /> <br />Staff would recommend awarding this project to C.S. McCrossan in the amount of $803,995.90. <br /> <br />Levang asked why there was a 20 percent difference in the bids. <br /> <br />Struve indicated it is difficult to estimate projects since some of it is done based on last year’s projects <br />and projecting out. <br /> <br />Levang asked if there were one or two items that consisted of that difference. <br /> <br />Struve indicated the cost of the asphalt was lower than anticipated and was the major item. <br /> <br />Bremer commented the bids were somewhat spread out as well and noted one bid was close to the <br />estimate. <br /> <br />McMillan asked if Staff is comfortable with this contractor. <br /> <br />Item #02 - CC Agenda - 05/28/2013 <br />Approval of Council Minutes 05/13/2013 <br />[Page 20 of 26]
The URL can be used to link to this page
Your browser does not support the video tag.