My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Reso 3359
Orono
>
Property Files
>
Street Address
>
F
>
Forest Lake Landing
>
4415 Forest Lake Landing - 07-117-23-24-0047
>
Resolutions
>
Reso 3359
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:33:30 PM
Creation date
1/27/2017 11:22:01 AM
Metadata
Fields
Template:
x Address Old
House Number
4415
Street Name
Forest Lake
Street Type
Landing
Address
4415 Forest Lake Landing
Document Type
Resolutions
PIN
0711723240047
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , • <br /> �' ��' CITY of ORONO <br /> o : o <br /> ��"�_�=> RESOLUTION OF THE CIT'Y COUNCIL <br /> '� `��'J;�� �, N0. � � � � <br /> '�n ' � <br /> � .c`� ti, <br /> �'�9, �;1�� g�G <br /> kE3H� <br /> CONCLUSIONS, ORDER A�\'D COI�'DITIONS <br /> Based upon one or more of the above findings, the Orono City Council hereby <br /> arants variances to Municipal Zonina Code Section 10.22, Subdivisions 2 granting a hardcover <br /> variance within the 75-250' setback area of 825 s.f. or 4.29% and per Section 1Q.24, <br /> Subdivision 5 (A) granu a height variance for an observation tower that will be 35' in height <br /> subject to the following conditions: <br /> 1. Prior to filin� an application for new construction, applicants must apply for the <br /> legal combination of the five separate parcels that make up the building site. <br /> 2. Upon application for a building permit, applicants will make payment for a sewer <br /> connection charge at �11,744.50 per the 1995 fee schedule and a Sewer <br /> Availability Charge of $850.00 based on the MWCC's 1995 fee schedule. <br /> 3. The City shall require permits for the installation of the drainfield and extension <br /> of municipal sewer to residence. Applicants' consultanUcontractor shall provide <br /> engineering plans with appropriate design and spec information for the review of <br /> the City En�ineer. <br /> 4. Upon the issuance of a certificate of occupancy for t�le completion of the <br /> residence structure, applicants may apply for a permit to install a residential dock. <br /> Applicants shall install dock at the eastern shoreline so as not to encroach <br /> wetlands at the southern shoreline. <br /> 5. Authorities granted by this resolution run with the property not with the <br /> applicants, but are permissive only and must be exercised by application for a <br /> building permit within one year of the date of Council approval, or this variance <br /> will expire on that date (May 8, 1996). <br /> 6. Violation of or non-compliance with any of the terms and conditions of this <br /> resolution shall constitute a violation of the zoning code, shall automatically <br /> terminate any authority granted herein, and shall be punishable as a misdemeanor. <br /> Page 3 of 5 � <br /> ���, ��, <br />
The URL can be used to link to this page
Your browser does not support the video tag.