My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011
Orono
>
Property Files
>
Street Address
>
F
>
Forest Lake Landing
>
4415 Forest Lake Landing - 07-117-23-24-0047
>
Land Use
>
2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:33:28 PM
Creation date
1/27/2017 11:14:37 AM
Metadata
Fields
Template:
x Address Old
House Number
4415
Street Name
Forest Lake
Street Type
Landing
Address
4415 Forest Lake Landing
Document Type
Land Use
PIN
0711723240047
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , <br /> MINUTES OF TI� ORONO PLANNING COMMISSION - * <br /> MEETING HELD ON APRIL 17, 1995 _ - - <br /> (#8 - #2011 Tim & Lori Line - Continued) <br /> The Robert Wolfe's inquired if any tree removal would be needed. They noted that the <br /> roof line is below the tree line. Lori Line noted that it is their desire to maintain trees and <br /> add more if necessary. <br /> Iv'olan moved, Lindquist seconded, to approve Application#2011 for a height variance <br /> and hardcover variance in the 75-250' zone noting the benefit of the drainage system and <br /> the design mitigating restrictions. The motion includes item 1-5 and 1-3 as noted in the <br /> Staffrecommendations. Ayes 6, Nays 1, Rowlette, voted mainly on principal, as <br /> hardcover variance is required for new construction. <br /> (#9) #2014 JAMES NYSTROM, 1745 CONCORDIA STREET - VARIANCES - <br /> PUBL,IC HEARIlVG 8:59-9:20 P.M. <br /> The Certificate of Mailing and Af�idavit of Publication were noted. <br /> Mr. Nystrom was present and represented by his architect, Greg Frazee. <br /> Mabusth reported that the application is for proposed additions which would require <br /> lakeshore setback variances. The proposed additions are located in front of the average <br /> lakeshore setback line. The existing structure's patio encroaches into the neighbor's <br /> property. The neighbor's 3-season porch also enroaches on this property. The great room <br /> addition would be located 1.6" from the south side lot line and the rear bedroom addition <br /> 1.6' from the same side lot line. <br /> Frazee reported their surprise when the survey showed the structure 1.6' from the lot line. <br /> This will affect the preliminary ptans as presented. Frazee noted that the improvements <br /> stay within the roof line of the existing house. The upper levet improvements are for a <br /> deck, atrium portion of great room, and stairwell to gain access to the master bedroom. <br /> Peterson inquired about the distance between the structures. Frazee responded that a <br /> change would be needed for the foyer area and possible move of the great room or <br /> guestroom to the north side of the house. Rowlette commented that there are problems <br /> with either additions not meeting the side setbacic, and a change in plans would be <br /> necessary. <br /> Frazee asked for commission's comments on the hardcover in the 75-250' zone. Lindquist <br /> said the area needs to be measured out and figured for reductions. <br /> Berg asked if the foundation would be able to handle the new additions. Frazee said the <br /> original foundation should be adequate to handle the new additions. Mabusth asked had <br /> this been confinned of a structural engineer, for if a new foundation is needed, the whole <br /> structure could be moved. <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.