Laserfiche WebLink
Zoning File #2011 <br /> April 11, 1995 <br /> Page 4 <br /> Options of Action <br /> To approve or deny as proposed; or <br /> To approve as amended. <br /> Any condition of approval must include the following conditions: <br /> 1. Prior to the filing of an application for new construction, applicants must apply <br /> for the legal combination of the five separate parcels that make up the building <br /> site. <br /> 2. Upon application for a building permit, applicant will make payment for a sewer <br /> connection charge at $11,744.50 per 1995 fee schedule and a SAC payment of <br /> $850.00 based on MWCC's 1995 fee schedule. <br /> 3. The City shall require permits for the installation of the drainfield and extension <br /> of municipal sewer to residents. Applicants' consultant/contractor shall provide <br /> all design and spec information for the review of the City Engineer. <br /> ch <br />