Laserfiche WebLink
� i� � <br /> MINUTES OF THE <br /> ORONO PLANNING COMMISSION NIEETING <br /> Monday, October 16,2000 <br /> Berg: No. <br /> Larsen: Explain the number for structural coverage. <br /> Kluth: We can't send this on. <br /> Lindquist: Yeah,we can't. <br /> Kluth: We're sitting here doing this on the fly. The proposal or the analysis,the worksheet, <br /> is not complete. We can't fix it all here. Go back and rework this proposal and show what <br /> truly was there before. <br /> Nvgard: Is there any way to split this application so we can get going on the retaining wall. It <br /> sounds like we're in agreement to replace your retaining wall. <br /> Stoddard: A quick question. Who did the hardcover calculation worksheets. You or your <br /> surveyors? <br /> Larsen: Surveyors did it, Advanced Surveying. <br /> Stcddard: They didn't know or they inconectly included that. <br /> Larsen: No,because it�vasn't there. , <br /> Nygard: Did they incorrectly include the landscape plastic as hardcover? <br /> Lindquist: Can we move and move the block wall—I take it you want to do this wall? <br /> Larsen: I'd like to do the w•hole thing. <br /> Lindquist: Well, I'm not«�illing to move ahead on the rest of this due to the hardcover <br /> calculations. How comfortable are you, Paul? <br /> Weinberger: Well,the calculations are on page—I'm sure you're looking at the analysis <br /> �vorksheet,which is page four,and I think some of the confusion is regarding existing versus <br /> proposed. The number in the last sentence of the paragraph under hardcover calculations, it <br /> states, if this is removed, and that's referring to all of the landscape fabric,the hardcover on <br /> the property is 4,371 square feet. Ho�z•ever,that's the e�cisting number right now. You have <br /> to keep in mind the deck has already�been removed, so that 4371 does not include the 13� <br /> PAGE 42 <br />