My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08-19-2013 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2013
>
08-19-2013 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2018 3:32:06 PM
Creation date
4/6/2015 3:10:25 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
317
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, July 15, 2013 <br />6:30 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 3 of 23 <br /> <br />Gustafson indicated it will be removed. <br /> <br />Chair Leskinen opened the public hearing at 6:40 p.m. <br /> <br />John Miller, 4423 North Shore Drive, asked what the current erosion control plan is for the property. <br /> <br />Curtis stated the applicant can probably address that issue better but that there should be erosion control <br />fencing up. At the time of the issuance of the permit, the City will review the erosion control and the <br />applicant will be required to obtain a permit from the Minnehaha Creek Watershed District. <br /> <br />Miller asked what the current erosion plan is. <br /> <br />Curtis stated if he is referring to the home that is going to be constructed, there should be erosion control <br />fencing up. <br /> <br />Thiesse noted there is fencing and straw bales up above the top of the bank. <br /> <br />Miller asked what the distance is of the fencing. <br /> <br />Thiesse stated he does not know the exact distance but that he walked the property today and the length of <br />the fencing appears to be close to the length of the gray line depicted on the overhead.. <br /> <br />Curtis displayed the survey on the overhead. <br /> <br />Miller asked if that is in the 0-75 foot setback. <br /> <br />Curtis indicated the plans show the fencing is supposed to be outside the 0-75 foot area. <br /> <br />Miller asked what the purpose is of the silt fence. <br /> <br />Curtis stated the purpose is to protect soil and debris from entering the lake from the construction project. <br /> <br />Miller asked who checks on that. <br /> <br />Curtis indicated the Minnehaha Creek Watershed District as well as City Staff. <br /> <br />Miller asked if the Minnehaha Creek Watershed District is represented at tonight’s meeting. <br /> <br />Curtis stated to her knowledge they are not here tonight. Curtis asked if there is an issue with the erosion <br />control. <br /> <br />Miller noted there have been some pretty heavy rain storms recently. <br /> <br />Curtis stated Staff can check on the situation tomorrow. <br /> <br />Miller noted one of the Commissioners said he was at the property today and asked if he didn’t notice that <br />there was erosion going down to the lake beyond the silt fence. <br /> <br />Item #01 - PC Agenda - 08/19/2013 <br />Approval of Planning Commission Minutes 07/15/2013
The URL can be used to link to this page
Your browser does not support the video tag.