My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00589 - new septic
Orono
>
Property Files
>
Street Address
>
H
>
High Lane
>
3445 High Lane - 05-117-23-12-0025
>
Septic
>
2009-00589 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:16:18 PM
Creation date
1/26/2017 2:46:52 PM
Metadata
Fields
Template:
x Address Old
House Number
3445
Street Name
High
Street Type
Lane
Address
3445 High La
Document Type
Septic
PIN
0511723120025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UMrvEumof'AdIK�e.smn - <br /> Pump Setection Design � _ <br /> � <br /> Minnesota Pollution WOI'�CSf1C@t �'"` � Y ' <br /> o: <br /> Co�trol A enc - "'...°'+;,.,` <br /> 1. PUMP CAPACITY <br /> 1. Pumping to Gravity Distribution <br /> A. Minimum discharge is 10 GPM(15 GPM recommended) �GPM <br /> B. Maximum discharge is 45 GPM <br /> 2. Pressure Distribution <br /> O mdN�d�i ssrs O c��o�,s� <br /> Required Flow Rate (Line 11 of Pressure Distribution or Line 10 of Non-Level) 29,0 GPM <br /> C. Distribution to: ❑Soil Treatment Unit ❑Media Filter ❑ATU ❑Other <br /> 2. HEAD REQUIREMENTS <br /> 1 O treahnent system <br /> 3. Elevation Difference ft &point of discharge <br /> a <br /> between pump and point of discharge: <br /> th <br /> S�Ppi\��\ecH .. <br /> NOTE:IFsystem is an individual subsurface sewoge[reatment ��a� ✓lr <br /> stem,com (ete ste 4-9. 1 ys E��� <br /> sy p ps f system is a Collection S tem, 0 !` d���e�eMe <br /> skip steps 4,5, 7 and 8 and go to Step f0. <br /> ----------------------------- -------------• <br /> 4. Distribution Head Loss: �ft <br /> 5. Additional Head Loss: �ft (due to special equipment,etc.) <br /> Distribution Head 1_oss Fnctwn Loss m asfic P�pe per 100 <br /> Gravity Distribution = Oft C=130 <br /> Pressure Distribution based on Minimum Average Head Nominal Pipe Diameter <br /> Value on Pressure Distribution worksheet: F ow Rate � 1'/s 13fz 2 3 <br /> GPM <br /> Minimum Avera e Head Distribution Head Loss �p 9.11 3.08 1.27 0.31 <br /> 1ft 5ft -- <br /> 2ft 6ft 12 12.77 4.31 1.78 0.44 -- <br /> 5ft 1 oft 14 16.99 5.74 2.36 0.58 -- <br /> 16 --- 7.35 3.03 0.75 0.10 <br /> 6. A. Supply Pipe Diameter: 2,QQ in 18 --- 9.14 3.76 0.93 0.13 <br /> 2Q --- 11.11 4.58 1.13 0.16 <br /> B.Supply Pipe Length: 4�J ft 2g --- 16.79 6.92 1.71 0.24 <br /> 7. Based on Friction Loss in Plastic Pipe per t00ft from Tabte I: 30 --- --- 9.69 2.39 0.33 <br /> 35 --- --- 12.90 3.18 0.44 <br /> Friction Loss= 2,23 ft per 100ft of pipe 40 --- -- 16.52 4.07 0.57 <br /> 45 --- --- --- 5.07 0.70 <br /> g_ Determine Equiva(ent Pipe Length from pump dixharge to soil dispersal 5O ___ ___ ___ 6.16 0.86 <br /> area discharge point. Estimate by adding 25%to supply pipe length for <br /> fitting toss. Supply Pipe Length(5.8) X 1.25=Equiva(ent Pipe Length 55 --- --- --- 7.35 1.02 <br /> bo --- --- --- s.sa �.20 <br /> 45 fc x ,.25 = 5b.25 ft 65 -- --- --- 10.0� �.sa <br /> 70 --- -- --- 11.48 1.60 <br /> 9. Calculate Supply Friction Loss by multiptying Friction Loss Per 100ft (Line 6)by the Equivalent Pipe Length (Line 7)and divide by 100. <br /> Suppty Fridion Loss= <br /> 2.23 fc���oo� x 56.25 ft - ,00 = 1.3 ft <br />
The URL can be used to link to this page
Your browser does not support the video tag.