My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00589 - new septic
Orono
>
Property Files
>
Street Address
>
H
>
High Lane
>
3445 High Lane - 05-117-23-12-0025
>
Septic
>
2009-00589 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:16:18 PM
Creation date
1/26/2017 2:46:52 PM
Metadata
Fields
Template:
x Address Old
House Number
3445
Street Name
High
Street Type
Lane
Address
3445 High La
Document Type
Septic
PIN
0511723120025
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. MOUND SIZING <br /> A. Calcutate Cleon Sand Lift: 3 feet minus Depth to Limiting Condition (1.C) =C(ean Sand Lift (1 ft minimum) <br /> 3.0 ft - 2.0 ft = 1.0 ft <br /> B. Calculate Ups(ope Height: Clean Sond Lift (4.A) +media depth (1 ft.)+cover (1 ft.) =Upslope Height <br /> 1.0 ft + 1.0 ft + 1.0 ft= 3.0 ft <br /> D-34:Slope 1.lultiplier Table <br /> Land Slope% 0 I 2 3 4 5 6 7 8 9 10 t1 I2 13 ta t5 16 17 18 /9 20 2f 22 23 24 25 <br /> UpSlOp2 3:1 3.OQ 2.91 2.83 2.75 2.68 2.61 2.SJ 2.J8 2.J2 2.36 2.31 2.25 2.21 2.17 2.13 2.C9 2.06 2.03 2.00 1.97 1.95 1.93 1.91 1.89 1.87 1.85 <br /> Berni Ratio a:t 4.Q0 3.85 3.70 3.57 3.d5 3.33 3.23 3.12 3.03 Z.4J 2.86 2.78 2.70 2.62 2.55 2.:t8 Z.41 2.35 2.29 2.23 z.18 2.13 2.aB 2.D3 1.98 1.93 <br /> Land$lope:; 0 1 2 3 4 5 6 7 8 9 f0 11 12 13 14 IS ib 17 18 19 20 21 22 23 24 25 <br /> UO�•l�SlOp2 3:1 3.00 3.09 3.19 3.30 3.�7I 3.53 3.66 3.80 3.95 J,ii J.29 .i..t8 J.69 y.95 5.2J 5.55 5.88 6.2:1 6.63 7.OJ 7.d7 7.93 8.d2 6.93 9.J6 t0.D2 <br /> B?I'm Ra[iU J:1 4.00 a.t7 .3.35 a.5-t aJ6 S.CO 5.26 5.56 5.88 6.25 6.67 7.14 7.69 8.29 8.91 9.57 10.24 10.9J it.67 12.a2 t3.i9 13.99 1a.82 15.67 16.SJ 17.d4 <br /> � Select Upslope Berm Multiplier <br /> (based on land slope): 2•$6 (figure D-34) <br /> D. Calculate Upslope Berm Width: Multiplier (4.C)X Upslope Mound Height (4.6) =Upslope Berm Width <br /> 2.86 ft X 3.0 ft = 9.0 ft <br /> E. Calculate Drop in Elevation Under Bed: Bed Width (2.6) X Land Slope (1.D) : 100=Drop (ft) <br /> 10.0 ft X 12.00 % : 100= 1.20 ft <br /> F. Calculate Downslope Mound Height: Upslope Height (4.6) +Drop in Elevation (4.E) =Downslope Height <br /> 3.0 ft + 1.20 ft = 4.2 ft <br /> Select Downs(ope 8erm Muttiplier <br /> �� (based on land stope): 4.69 (figure D-34) <br /> H. Calculate Downslope Berm Width:Muttiplier (4.G)X Downslope Height (4.F) =Downslope Berm Width <br /> 4.69 x 4.2 ft = 20.0 ft <br /> 1. Calculate Minimum Berm to Cover Absorption Areo: Downslope Absorption Width (3.6 or 3.C) +4 ft. =ft <br /> 10.0 ft + � ft = 14.0 ft <br /> J. Design Downslope Berm =greater of 4H and 41: 20.0 ft <br /> K. Select Endslope Berm Multiplier: 3.00 (usually 3.0 or 4.0) <br /> L. Calculate Ends(ope Berm (4.K)X Downstope Mound Height (4.F) =Endslope Berm Width <br /> 3.00 ft X 4.2 ft = 12.0 ft <br /> M. Calculate Mound Width: Upslope Berm Width(4.D)+ Bed Width (2.B) +pownslope Berm Width (4.J} =ft <br /> 9.0 ft + 10.0 ft + 20.0 ft = 39.0 ft <br /> N. Calculate Mound Len�th: Endslope Berm Width (4.L} + Bed Length (2.C) +Endslope Berm Width (4.L) =ft <br /> 12.� ft + 38.0 ft + 12.0 ft = 62.O�ft <br /> 5. ORGANIC LOADING: (Optional) <br /> A. Organic Loading = Design Ftow X Estimated BOD in mg/L in the effluent X 8.35 : 1,000,000 <br /> 450 gpd X mg/L X 8.35 : 1,000,000 = �lbs BOD/day <br /> B. Calculate System Organic Loading: lbs. BOD (5.A) :Bed Area (2.A) = lbslday/ft2 <br /> lbs/day = �ft2 = �lbs/day/ftz <br /> C. Recommended Organic Loading Rate: �lbs/day/ft2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.