Laserfiche WebLink
. <br /> A pumping chamber will need to be installed to lift the effluent to the treatment area. <br /> The power supply and switches must be located outside the manhole and pumping <br /> chamber in a weather proof enclosure. A warning device must be installed with a light <br /> and sound device, this is in case of a pump failure. <br /> The manifold and supply line pipe must have back drainage to the pumping chamber. <br /> The distribution pipes shall have their ends capped. Be sure the rock and sand fill <br /> material are clean. The sod layer below the entire mounded area must be turned over, <br /> just break up the sod, be sure not to over work. <br /> All neighboring wells are located greater than 70' away from the proposed treatment <br /> area. <br /> Keep all heavy equipment off of the proposed treatment area before and after <br /> construction. The treatment area_should be marked off before construction. This <br /> Design is not valid &the system will need to be relocated if failure to protect the areas <br /> proposed for On-Site Sewage Treatment occurs. <br /> With proper installation and maintenance, this system should have no problem in <br /> treating septic effluent effectively. <br /> Nothing other than human waste, toilet tissue, laundry, showers, water softener etc. <br /> should be disposed of into the septic tanks. Recommend Iron filters be dive�ted out of <br /> the system. Recommend to divert the water softner also if the iron filter is diverted. <br /> Garbage disposals are not recommended, due to adding more solids & fine solids <br /> passing through to the system. Excessive amounts of soaps, antibacterial soaps, <br /> cleaning agents, shower cleaners used every shower 8� chlorine agents may kill the <br /> bacteria needed to treat septic ef�luent. Additives are not recommended. Recommend <br /> to pump & clean your tanks through the manhole by a certified pumper every 2 years. <br /> Check with your pumper to set up a schedule. Recommend laundering be limited to 3 <br /> to 4 loads per day. <br /> �'��°'�.����-T'� <br /> ��.. <br /> Steven B. Schirmers <br /> 2 <br />