My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-00577 - new septic
Orono
>
Property Files
>
Street Address
>
H
>
High Lane
>
3415 High Lane - 05-117-23-12-0017
>
Septic
>
2009-00577 - new septic
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 5:16:10 PM
Creation date
1/26/2017 2:03:49 PM
Metadata
Fields
Template:
x Address Old
House Number
3415
Street Name
High
Street Type
Lane
Address
3415 High La
Document Type
Septic
PIN
0511723120017
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. APPROXIMATE VOLUME CALCULATIONS: <br /> A. Rock Area =Absorption Bed Length (1.F) X Absorption Bed Width (1.E) <br /> 75.0 ft X 10.0 �ft = 750.0 ftz <br /> B. Rock Vo(ume in Cubic Feet = Rock Area (4.A) by Depth of Media (Rock) (1 foot) and divide by 2. <br /> 750.0� ftz X 1 ft : 2 = 375.O�ft3 <br /> C. Rock Vo(ume in Cubic Yards = Vo(ume in Cubic Feet (4.6) divided by 27 <br /> 375.�ft3 : 27 = 13.9 yd3 <br /> D. Loamy or Sandy Loam Cover Materia( Vo(ume: <br /> Volume in Cubic Feet= System Width (2.J)X System Length (2.K)X 1.5 :2, minus rock vo(ume (4.8) <br /> ( 24.0 ft X 91.0 ft X 1.5 : 2) - 375.0 = 1260.3 ft3 <br /> E. Loamy or Sandy Loam Cover Vo(ume in Cubic Yards = Volume in Cubic Feet (4.D) divided by 27 <br /> 1260.3 ft3 : 27 = C46.7 yd3 <br /> F. Add 20% for constructability: 46.7 yd3 X 1.2 = 56.0 yd3 <br /> G. Topsoil Volume in Cubic Feet = System width (2.J) X System Length (2.K) x 0.5 <br /> 24.0 X 91.� X 0.5 = 1090.2 ft3 <br /> H. Topsoi( Vo(ume in Cubic Yards = Volume in Cubic Feet (4.G) divided by 27 <br /> 1090.2 ft3 : 27 = 40.4 yd3 <br /> I. Add 20%for constructability: 40.4 yd3 X 1.2 = 48.5 yd3 <br /> 5. Or anic Loadin : o tional <br /> A. Organic loading = Design Flow (1.A) X Estimated BOD in mg/L in the effluent X 8.35 : 1,OOO,Q00 (Table III) <br /> 450�gpd X mg/L X 8.35 : 1,000,000 = lbs BOD/day <br /> B. Catculate System Orgonic Loading: (bs. BOD (5.A) :Absorption Bed Areo (1.G) = lbs/day/ft2 <br /> lbs/day = ftZ = tbs/day/ft2 <br /> 5. Comments: <br /> I hereby certify that I have completed this work in accordance with atl applicable ordinances, rules and laws. <br /> Joseph J Olson 810 8/10/09 <br /> (Designer) (Signature) (License#) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.