Laserfiche WebLink
� o� <br /> 10 � o <br /> � �� ���� CITY of ORONO <br /> 1� �'���r�� ��� '" <br /> r�',, �,� �r,,��`,!�`� ,�ti Municipal Offices <br /> � ����� ���I���G,� <br /> � ��''�'�'�'�-'�� Street Address: Mailing Address: <br /> 9 �'�I'y�i I 1`' `�v <br /> �ESIIO 2750 Kelley Parkway P.O. Box 66 <br /> Orono, MN 55356 Crystal Bay, MN 55323-0066 <br /> Owner: �j,L�j2�d Gl►�fi�l1Nd Address: 3415 High Ln. <br /> Permit #'s: none Dates: Contractors: unknown <br /> (This is [�] an existing system [ ] new construction) . <br /> SYSTEM COMPLIANCE (1-3) : 3 <br /> 1 Code System: Meets or exceeds current City standards in all respects relating to design, <br /> construction, and location. Appears to be operating properly. <br /> 2 Comy�liant System: Does not meet all current City standards for new construction, but in <br /> most respects appears to be designed, located, and constructed in accordance with previous <br /> codes and is functioning properly. <br /> 3� Non-Com�],iant System: System may or may not meet current City standards for design, <br /> construction, or location, but is failing to properly treat and dispose of the current <br /> input; and any system with less than three feet of vertical separation between the bottom of <br /> the drainfield and the saturated soil level. <br /> (The saturated soil level [�] has or [ ] has not been identified at this time. If the <br /> saturated soil level has not een identified, this classification is subject to revision.) <br /> TANK CONDITION (5-9) : 9 <br /> 5 Pumpout not needed at this time. <br /> 6 Solids accumulation in tanks indicates they should be pumped out this year. <br /> 7 System is discharging to the surface. Tanks must be pumped out within 48 hours. <br /> 8 Inspection risers missing-tanks could not be inspected. If tanks have not been pumped out <br /> � within three years, they should be pumped out and risers installed now. <br /> Inspection pipe is located over tank baffle-can not measure solids accumulation. If tanks <br /> have not been pumped out within three years, they should be pumped out now. <br /> (During the last septic tank Maintenance Pumpout the tanks [ ] were or [�] were not confirmed <br /> to be watertight by the licensed pumping contractor. If the tanks were not confirmed to be <br /> watertight, this classification is subject to revision.) <br /> D N - 4 : 11 <br /> 1 Drainfield is dry, no surfacing evident. <br /> 2 Some evidence of surfacing, not critical yet. Repair is not required at this time. <br /> 13 Drainfield is saturated and visibly discharging untreated effluent to the surface. Contact <br /> the City Inspector immediately. Repair must be completed within 90 days. <br /> 14 Drainfield extent and condition unknown. <br /> POTENTIAL FOR SYSTEM FAILURE: (system age and condition, soils. etc.) : medium <br /> COMMENTS: In order to confirm that your septic system meets Minnesota standards, soil borings <br /> were performed to verify a 3 foot separation between the drainfield and the seasonal water table. <br /> The separation is .8 feet and the system is non-compliant. Repair or replacement of the septic <br /> system is required by 12/31/2007. <br /> �--�9'�7 <br /> � <br /> Date of Inspection Sep System Inspec or <br /> Note: In the event that this inspection report is used to satisfy the requirements for a <br /> transfer of property, this report does not guarantee that an existing system will continue to <br /> function properly, but indicates the operation of the system under current conditions. <br /> Telephone (612) 473-7357 • FAX 473-0510 <br />