Laserfiche WebLink
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, August 18, 2014 <br />6:30 o’clock p.m. <br />_____________________________________________________________________________________ <br />  <br />Page 28 of 33  <br />  <br />Gaffron stated approximately three to four years ago, the City improved its 2008-2030 Comprehensive <br />Plan. One of the City’s requirements was to meet Metropolitan Council’s goals for density and, as a <br />result, certain properties generally along Highway 12 and Navarre were re-guided in the Comprehensive <br />Plan to allow for higher density. <br /> <br />The property in question is the Eisinger property, which is at the very west end of the Highway 12 <br />corridor area. A portion of the property has an encumbrance of a former sanitary landfill, which leaves <br />part of the property unusable for a number of things but that it is potentially usable for some uses that do <br />not require foundations. The property generally has five acres that could be used for a housing <br />development. <br /> <br />Gaffron stated this land was re-guided in the Comprehensive Plan to allow for 10 to 15 units per acre, <br />which would require City sewer and water. Sewer would be extended from Old Crystal Bay Road along <br />Highway 12 past the Dumas Orchard property. Gaffron indicated the property was re-guided for higher <br />density with some specific language about how that higher density should occur. The Comprehensive <br />Plan suggested that there should be two buildings, but no more than two, and that they should not be <br />more than 42,000 square feet. The Comprehensive Plan also contemplated a multi-family dwelling <br />situation. <br /> <br />Gaffron indicated the applicants are proposing something a little different than that which Staff believes <br />will likely need a Comprehensive Plan Text Amendment to allow the proposed use. The applicants’ <br />proposed use is considered as detached townhomes. The applicants are prepared to make a presentation <br />on their proposal. <br /> <br />The Planning Commission has been provided a number of specific bullet points in Staff’s report on how it <br />would conform to the zoning district and the Comprehensive Plan. Gaffron indicated this development <br />would likely be a RPUD. The primary difference between what the applicants are proposing and what <br />exists at Stonebay is that these would be detached townhome units, with a small separation between them. <br />Gaffron stated the only way to get the required density is to have small, minimal setbacks between the <br />buildings. <br /> <br />Gaffron stated he would like the applicants to make a presentation on their proposal. <br /> <br />(Recess taken from 9:05 p.m. to 9:11 p.m.) <br /> <br />Donald Jensen, Land Development Director of Lakewest, LLC, stated they have met with Staff on this <br />property and have discussed various options. Jensen stated the 42,000 square feet creates certain <br />limitations on the layout of the development and that the Comprehensive Plan is basically silent as to <br />where the garages would go and whether they would be detached or underground parking. <br /> <br />Jensen stated they have looked at what the marketplace is comfortable renting for the square footage and <br />that they are proposing it at approximately 1,500 square feet. In addition, space for elevators and <br />hallways would need to be allocated, which would place the units at approximately 1,200 square feet if <br />the square footage is limited to 42,000 square feet. In this particular case, the units would likely range <br />between 1,200 to 1,600 square feet per floor plan. <br /> <br />Jensen stated they have worked with Staff on a number of different options and that they originally <br />proposed access to the site from the west side. That has since been revised and access is now being <br />Item #01 - PC Agenda - 09/15/2014 <br />Approval of Planning Commission Minutes <br />[Page 28 of 33]