My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10-20-2014 Planning Commission Packet
Orono
>
Planning Commission
>
2014
>
10-20-2014 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/21/2018 12:25:24 PM
Creation date
4/6/2015 1:35:14 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, September 15, 2014 <br />6:30 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 45 of 59 <br /> <br />2. Identify how property owners will be notified of the use and preservation of the conservation <br /> areas. <br /> <br />3. Identify how property owners will develop the septic system locations compatibility with the <br /> goals of the conservation easement areas. In addition, identify septic system maintenance issues <br /> on Lot 13, Block 3. Grittman noted a homeowners association would be in place for this <br /> development. Approximately one-third of the septic sites are located within the Conservation <br /> Easement and Staff is currently reviewing that situation. <br /> <br />4. Identify, with more specificity, the tree removals required subsequent to street construction and <br /> grading and for house/pad/driveway construction. The applicants have provided a grading plan <br /> depicting the road cuts as well as an extensive tree survey. Grittman noted one of the things that <br /> has not been included on the plan is identification of the driveway locations and what grading will <br /> be necessary for the house pads. <br /> <br />5. Specify details of retaining wall location and construction. <br /> <br />6. Identify the impacts of driveway construction, including reasonable gradients and impacts on tree <br /> removals. Grittman noted this is a repeat item. <br /> <br />7. Resolution of the park dedication issue for plat purposes. Grittman noted the applicant has been <br /> in discussions with the neighbors over the potential dedication of one lot for a park. Staff is <br /> in the process of reviewing the implications a park would have to the City as it relates to <br /> future maintenance and park dedication issues as part of this application. <br /> <br />8. Proposed use and potential replatting options for Outlot C. Grittman stated in the very southwest <br /> Corner there is an outlot that is approximately two acres in size and that Staff is looking at the <br /> potential for replatting and use of that parcel. <br /> <br />9. Recommendations of the City Engineer related to stormwater management, utility services, sewer <br /> and water provision, streets and traffic, and other comments as detailed in his report dated <br /> September 12, 2014. <br />Item #01 - PC Agenda - 10/20/2014 <br />Approval of Planning Commission Minutes 09/15/2014 <br />[Page 45 of 59]
The URL can be used to link to this page
Your browser does not support the video tag.