My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Team <br /> The SEH D�B delivery team brings several advantages to your project, <br /> including extensive water tank inspection, repair, rehabilitation, <br /> coatings, and telecommunications experience on similar projects <br /> throughout the Midwest. <br /> In addition, our team includes inspectors who are certified by the <br /> National�ssociation of Corrosion Engineers (NACE), the Society for <br /> Protective Coatings (SPC), and the American Welding Society (AWS). <br /> Key project personnel qualifications are summarized in the following <br /> descriptions. <br /> Your primary contacts for this project will be: <br /> - Mr.Jason Sprague, PE <br /> Project Engineer <br /> 612.217.4420 � Direct <br /> ispraguc�r schinc.a�m <br /> Mr. Dan Zienty, PE, NACE, SSPC <br /> Coatings Inspector and Telecom Specialist <br /> 651.490.2160 � Direct <br /> 612.280.3450 � Gell <br /> dzient���i�schinc.com <br /> Ms.Jana Nyhagen, PE <br /> Operations Manager <br /> 715.861.4869 � Direct <br /> 715.781.4567 � Cell <br /> jnvhagenCsehinc.com <br /> project team � page 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.