My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Scope of Services <br /> SEH D�B shall,within the term of this contract,provide services in <br /> accordance with the indicated schedule and specified�vork items and <br /> repairs. These services will be provided at the following tank: <br /> 400,000 Gallon Hydropillar Tank <br /> City Hall <br /> • Table A-Schedule of Services <br /> • Table B—Specific Work Items and Repairs <br /> • Contract Deliverables <br /> • Performance Guarantees <br /> • Schedule of Payments <br /> . Work Plan <br /> The Work Plan under this contract will generally consist of four <br /> �� procedures,which are defined as follows: <br /> �� • Rehabilitation: This will include the complete cleaning and <br /> _ � i preparation of the exterior, dry interior,wet interior and pit piping, <br /> ,� <br /> � �, and the application of a new coating system. This work may also <br /> include structural modifications to the appurtenances and <br /> �� equipment. <br /> � � `-, , • Visual Siu-��ey: Annual visual inspections of the tank are performed <br /> ; �', while the tank remains in service to determine the general <br /> j condition of the coatings and accessories. This work will include a <br /> E report summarizing the results of the inspection. <br /> � • General Maintenance: The wet interior and exterior surfaces will be <br /> washed at scheduled intervals, as well as performing spot coating <br /> repairs to needed areas of the tank. This may also include minor <br /> � modifications to the tank appurtenances and equipment. <br /> • Engineering Evaluation:A detailed inspection of the tank is <br /> performed to determine the specific structural and sanitary <br /> conditions, as well as the condition of coatings systems relative to <br /> accepted industry standards. This work will include the entrance of <br /> Our comprehensive maintenance <br />� approach includes ongoing maintenance, personnel into the�vater storage areas to inspect all interior <br /> such as periodic washdowns,and will surfaces. The Engineering Evaluation will also include a report that <br />� keep ihe tank looking good for the describes existing conditions and presents recommendations for <br /> d��ac�o�ofthe�o�cra�t. future maintenance and rehabilitation. <br />� scope of services � page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.