My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Upon application of the coating sysCem, the roof beams and seams <br /> will be caulked and the tank interior will be disinfected as per <br /> AWW�C652. <br /> • ll�y Interior: The dry interior is showing signs of minor <br /> � deterioration in several locations. <br /> � ���� The underside of the bowl and some areas within the access tube <br /> r..r <br /> _���` will require a spot abrasive blast clean to a SSPGSP6 `commercial <br /> �'�� ' blast' cleaning condirion. On any other corroded areas within the <br /> ,��_ <br /> , , . <br /> � dry interior,we recommend preparing the surFace to a SSPC-SP3 <br /> � .'���:: <br /> - ��.�� ,.'� _� �` �� `power tool cleaning' condition. <br /> �_ ' ;� �,;' <br /> � ' The proposed coating system for the dry interior repairs will be <br /> similar to that proposed for the wet interior and consist of two coats <br /> of epoxy coating to the prepared dry interior surfaces of the tank. <br /> � <br /> � . <br /> By using our recommended coating systems in conjunction with our <br /> ti� <br /> ' comprehensive maintenance approach,you can be assured that your <br /> water storage facility will be protected from premature coating failures <br /> . and corrosion of the underlying steel structure. The normal <br /> The underside of the bowl will need to be rehabilitation period for the tanks protected by SEH D�B is 15 to <br /> abrasive blast cleaned to remove 2�}'earS. <br /> corrosion and apply a new coating <br /> System. Our comprehensive maintenance plans extend the period of time <br /> benveen major rehabilitations, allowing our clients to eliminate one or <br /> possibly nvo major tank rehabilitations over the typical i5-year useful <br /> life of a water tank, sa�ing hundreds of thousands of future tank <br /> maintenance dollars. <br /> Other Tank Improvements/Modi f►cations <br /> As identified in our inspection, there are several antennas located on <br /> the tank. These antemias, and the related equipment,will need to be <br /> removed prior to commencement of the rehabilitation activities. Any <br /> painting of antenna components not welded to the structure of the <br /> tank will be the responsibility of the telecom provider. The antennas <br /> can be reinstalled upon completion of the rehabilitation project. <br /> Based on the findings of our tank inspection, the existing manways, <br /> � hatches, and railings have been found to be satisfactory and compliant <br /> with current standards. <br /> A comprehensive listing of all proposed tank improvements and an <br /> implementation timeline is identified in the Scope of Services section <br /> of this proposal. <br /> Our proposed Scope of Services includes the follo���ing: <br /> • Tank rehabilitation <br /> • Safety improvements <br /> • Routine maintenance <br /> • Annual inspections <br /> • Periodic tank wash-outs and exterior power washing <br /> � recommended approach � page 8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.