My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� SEI�IDesi n Build <br /> � g � <br /> August 15, 2013 RE: City of Orono, Minnesota <br /> Water Tank Maintenance Service <br /> Mr.Jesse Struve, PE <br /> City Engineer/Director of Public Works <br /> City of Orono <br /> 2750 Kelley Park�vay <br /> Orono, MN 55356 <br /> Dear Mr. Struee: <br /> SEH Design�Build,Inc. (SEH D�B) is pleased to present �his report and proposal for a multi-year <br /> professional services contract to rehabilitate and maintain your elevated water storage tank. The tank <br /> analyzed in this report is the 400,000 gallmi hydro�iillar tank, located direcdy north of City Hall that was <br /> inspected on December 6`h, 2012. <br /> The initial contract period is proposed for a duration of five years. It may be extended beyond this <br /> contract period to include future work at the City's request. Our unique design-build approach to the <br /> work under this proposal will consist of the engineering, repair, rehabilitation, inspection and <br /> maintenance of the tank and associated appurtenances and will provide the following benefits. <br /> Features and Bene fits o f Design-Build Tank Maintenance <br /> Sole-source responsibility ➢ Work with one comprehensive delivery team <br /> Extended warranty ➢ Routine maintenance and repair services for contract <br /> duration <br /> Direct contractor selection ➢ Eliminates the risk associated with "low bidder" contracting <br /> Reduced overhead costs ➢ Scheduled care will yield lower overall costs <br /> Convenient payment plan ➢ Eases the fiscal demands of up-front rehabilitation costs <br /> Long-term cost predictability ➢ Takes the guesswork out of the annual budgeung process <br /> If you have any questions or requests for additional information, please contactJason Sprague at <br /> 612.217.4420 or via e-mail at jsprague@sehinc.com.We look forward to the opportunity of working <br /> with you to provide a comprehensive tank maintenance program for your water storage facility. <br /> Respectfully submitted, <br /> ���� �'�+��""�--� � <br /> ':�Iike Kraemer, E Jason P. Sprague, PE <br /> SEH Design�Build Business Development Manager <br />
The URL can be used to link to this page
Your browser does not support the video tag.