My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
would cost an additional $4,800 per logo. Typically there would be two logos placed on the tower <br /> (one on each side) so the total additional cost to add the logo on the water tower would be $9,600. <br /> It is my recommendation to include the logo on the water tower and to enter into a 10 year design- <br /> build maintenance contract with SEH. The total dollar amount for the 10 year maintenance contract <br /> is $548,800 as outlined on page 19 of Exhibit A, plus the additional $9,600 to add the logo in two <br /> locations. Therefore the total cost of the 10 year maintenance contract is $558,400. <br /> COUNCIL ACTION REQUESTED: <br /> Consider a motion to enter into a 10 year Design-Build Maintenance Contract with Short Elliot <br /> Hendrickson in the amount of$558,400. <br />
The URL can be used to link to this page
Your browser does not support the video tag.