My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-27-2014 Council Packet
Orono
>
City Council
>
2014
>
01-27-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:55 PM
Creation date
4/6/2015 1:13:23 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
369
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
#13-3637 <br /> December 5,2013 <br /> Page 4 <br /> Summary of Additional Subdivision Elements <br /> The following topics were addressed in the November Planning Commission memo, and are <br /> summarized here: <br /> Hardcover - Under the RPUD zoning the property is assigned to Hardcover Protection Tier 4, <br /> which allows up to 50% hardcover of the gross lot area. None of the proposed lots will be <br /> anywhere near that limit. <br /> Easements - Standard perimeter draina�e and utility easements around all individual property <br /> boundaries in the plat will be required. The Conservation Design Report recommends <br /> preservation of the northeast tree stand which would be subject to a conservation easement. The <br /> wetland and creek-associated wetland will be subject to the standard wetland easement. The <br /> existing Hackberry sewer line across Lot 1 and 2, Block 1 will be subject to dedication of a <br /> sewer easement. <br /> Park/Trail Easement/Fees or Dedication Needed. The 2008-2030 CMP Comprehensive Trail <br /> System Map (PC Exhibit O) indicates that a future trail is planned to extend down Willow Drive <br /> from Highway 12 to Hackberry Park. The plan terminates this trail at Hackberry Park and ends <br /> just short of the subject property. However, it picks up again further south at the Luce Line with <br /> a future connecting segment to Brown Road and the Dakota Trail. A 10' trail easement was <br /> dedicated along the west boundary of Glendale Cove, to allow for future extension of the City's <br /> public trail system along Willow Drive. The developer was not required to construct this trail <br /> extension. Staff recommends that a 10' trail easement be required along the west side of Oliver <br /> Hill for a possible future trail. <br /> The Park Fee is determined as 8% of the fair market value of the land being subdivided, with a <br /> minimum of$3250 per dwelling unit or a maximum of$5,550 per residential dwelling unit. The <br /> Hennepin County Assessor will be asked to review the land value once a final preliminary plat <br /> layout has been settled on. As there will be six new dwelling sites as currently proposed (the <br /> existing house at 2350 Watertown yields a 1-lot park fee credit), the Park Fee will be between <br /> $19,500 and $33,300. <br /> Stormwater and Draina�e Improvements. The developer is providing stormwater management <br /> facilities on the site consisting of a number of rain garden basins. The City Engineer notes that <br /> the drainage calculations meet City requirements such that proposed runoff rates will be less than <br /> existing runoff rates, but any plan changes will potentially require plan revisions. A final <br /> Stormwater Management Plan will have to be submitted with the Final Construction Plans. <br /> Additionally, the development is subject to the Stormwater and Drainage Trunk Fee, which <br /> should be based on an equivalence to the standard fee for the 1/2-acre zoning district given the <br /> lot sizes proposed. That fee is $5,765 per gross acre, and at 4.92 gross acres (net of Willow <br /> Drive r-o-w) amounts to $28,364.00. <br /> Utilities. The subject property is located within the Metropolitan Urban Service Area (MUSA); <br /> sewer service is available to these properties via the Hackberry system which discharges to the <br /> Long Lake system. Water service is potentially available from the Long Lake system, subject to <br />
The URL can be used to link to this page
Your browser does not support the video tag.