My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-20-2015 Planning Commission Packet
Orono
>
Agendas, Minutes & Packets
>
Planning Commission
>
Packets
>
2010-2019
>
2015
>
01-20-2015 Planning Commission Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/12/2016 9:18:07 AM
Creation date
4/6/2015 1:09:29 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINUTES OF THE <br />ORONO PLANNING COMMISSION MEETING <br />Monday, November 17, 2014 <br />7:00 o’clock p.m. <br />_____________________________________________________________________________________ <br /> <br />Page 2 of 23 <br /> <br /> <br />Elements of the study process will include the following: A review of the various types of SWECS and <br />their capabilities and limitations, as well as potential impacts to surrounding properties and uses; a review <br />of various model ordinances and existing ordinances enacted by other local municipalities with regard to <br />SWECS; and consideration of where and under what conditions SWECS should be allowed in Orono. <br /> <br />Gaffron stated the 2013 draft also included the following list of potential measures to mitigate the impacts <br />various alternative energy systems could have on neighborhoods: <br /> <br />1. Establishment of the defined types of systems that are allowed or prohibited; <br /> <br />2. Establishment of appropriate locations for each type of alternative energy system to ensure proper <br /> location of the systems. Those would include the minimum size of the property required and <br /> minimum setbacks from property boundaries and/or from offsite residences; <br /> <br />3. Establishment of standard procedures for construction process to minimize impacts of access, <br /> materials storage, erosion or other land disturbances, etc.; <br /> <br />4. Establishment of system design or performance standards that would eliminate the potential for <br /> the impacts noted above, such as standards for height, system size or capacity, physical location <br /> in relation to attachment to the ground or to structures, location of associated mechanical <br /> equipment, use of screening, visual aesthetics, safety, etc.; <br /> <br />5. Establishment of standards for system abandonment; and <br /> <br />6. Establishment of permit requirements. <br /> <br />Gaffron noted the Planning Commission reviewed alternative energy systems in 2013. During that <br />review, the Planning Commission reviewed sample WECS codes from a number of cities. The Minnesota <br />Pollution Control Agency has also generated a model ordinance similar to many others, which suggests <br />the following punch list of items should be included in a WECS ordinance in establishing wind generators <br />located in a residential neighborhood: <br /> <br />A. Distinguish between types of wind energy applications <br />B. Define necessary permits <br />C. Identify wind resource standards <br />d. Establish setbacks <br />E. Establish Safety Standards <br />F. Establish Design Standards <br />G. Establish other applicable standards <br />H. Minimize infrastructure impacts <br /> <br />The ordinance draft reviewed by the Planning Commission in November of 2013 addressed many of the <br />above elements and avoided or purposely did not address others. The 2013 draft established three types <br />of wind turbines based on the nameplate generating capacity. The draft did not acknowledge that WECS <br />of 5,000 kW capacity or larger are state-regulated. <br /> <br />Item #01 - PC Agenda - 01/20/2015 <br />Approval of Planning Commission Minutes <br />[Page 2 of 23]
The URL can be used to link to this page
Your browser does not support the video tag.