My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001-P04502 - air conditioning
Orono
>
Property Files
>
Street Address
>
H
>
Heritage Lane
>
1150 Heritage Lane - 10-117-23-13-0004
>
Permits/Inspections
>
2001-P04502 - air conditioning
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2023 3:19:03 PM
Creation date
1/26/2017 12:01:25 PM
Metadata
Fields
Template:
x Address Old
House Number
1150
Street Name
Heritage
Street Type
Lane
Address
1150 Heritage Lane
Document Type
Permits/Inspections
PIN
1011723130004
Supplemental fields
ProcessedPID
Updated
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.�+ , � ��� <br /> • � <br /> � �i <br /> � <br /> CITY OF ORONO APPLICATION FOR MECHANICAL PERMIT <br /> Box 66 (2750 Kelley Parkway) <br /> Crystal Bay, MN 55323 <br /> GENERAL INFORMATION <br /> 1. You may apply for mechanical permits by mail or in person at the City offices. Applications will be <br /> reviewed and a permit will be issued within 2 working days. <br /> 2. Permit cards will be sent by return mail after a review is completed. PERMITS ARE NOT VALID UNTIL <br /> YOU RECEIVE A PERMIT. WORK MUST NOT BEGIN UNTIL THE PERMIT CARD IS POSTED ON <br /> THE JOB SITE. <br /> 3. Mechanical Desi�ns - Complete calculations, details and specifications are required for each heating, <br /> ventilation, humidification-dehumidification, and air conditioning installation including heat loss/heat gain <br /> calculation, design temperatures, equipment ratings and identification as to type, manufacturer and model. <br /> Data shall be presented on form provided. Identification of and specifications for water heating equipment <br /> shall also be provided. <br /> 4. When any new construction or remodeling is involved, a separate building permit must be obtained. <br /> 5. All work must be done in accordance with the Uniform Mechanical Code/State Building Code requirements. <br /> 6. All work must be inspected (rough-in and final). Call 249-4600. 24-hour notice required. <br /> 7. House Heating Test Record must be submitted before final. <br /> Instructions Complete all items on this application. Compute the permit fee. Sign and date the certification. <br /> INCOMPLETE APPLICATIONS WILL NOT BE PROCESSED. If you have questions, call 249-4600. <br /> Please check one: New Addition Repair ✓Replace <br /> ✓ Residential �Commercial <br /> JOB SITE: ��54 1�fn i�/��:,,�- L�N� Zip: S;�3�i 1 <br /> Owner's Name: rv�r_��c7�.�, Telephone Number: �;5-i- �1 S �e�a� <br /> Mailing Address: �/���nC- City: Zip: <br /> Contractor's Name: �������c�E i-!��:-� ��-� Telephone Number: --��3--�1�i-��,c��� <br /> MailingAddress: �s��� ��i�,nY < � City: �1��� �>�l1+-� Zip: S5'�S`� <br /> SYSTEM DESCRIPTION <br /> HEATING SYSTEMS <br /> Quantity�: <br /> Make: <br /> Model: <br /> Fuel: <br /> Flue Size: <br /> Input BTUs: <br /> Output BTUs: <br /> CFM: <br /> COOLING SYSTEMS <br /> Quantity: � <br /> Make: �.�5p:�q�► <br /> Model: �.1c�L•�i �1 <br /> Tons: �{- <br /> H. Power <br />
The URL can be used to link to this page
Your browser does not support the video tag.