My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2014 Council Packet
Orono
>
City Council
>
2014
>
01-13-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:19 PM
Creation date
4/3/2015 12:46:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table 1 <br /> CITY OF ORONO <br /> GREEN TREES ROAD-SANITARY SEWER EXTENSION <br /> BMI PROJECT NO.C13.107005 <br /> PROJECT COST ESTIMATE <br /> August 15,2013 <br /> ALTERNATE 1-FORCEMAIN <br /> ITEM APPROX. UNIT <br /> NO. B1Q ITEM QUAN. UNIT PRICE AMOUNT <br /> 1 MOBILIZATION 1 LUMP Sl1M $ 4,3Q0.00 $ 4,300.00 <br /> 2 TRAFFIC CONTROL 1 LUMP SUM $ 'I,500.00 $ 1,500.00 <br /> 3 2"HDPE FORCEMAIN,DIRECTlONAL DRILLED B80 LF $ 35.00 $ 30,800.00 <br /> 4 2"HDPE SERVICE PIPE,OPEN CUT 210 LF $ 40.00 $ 8,400.00 <br /> 5 SERVICE CONNECTION TO FORCEMAIN 6 EA $ 1,000.00 $ 6,0�0.00 <br /> 6 FORCEMAIN CQNfdECTION TO EXlSTING MANHOLE 1 EA $ 8,000.00 $ B4O00.00 <br /> 7 2"CURB STOPS 6 EA $ 1,000.00 S 6,000.00 <br /> 8 FLUSHING CONNECTION 1 EA $ 2,000.00 $ 2,000.00 <br /> 9 COUNTY ROAD BfTUMINOUS PATCHING 36 SY $ 60.00 S 2,160.00 <br /> 10 PRIVATE STREET AND DRIVEWAY BITUMINOUS PATCHING 380 SY $ 50.00 S 18,000.00 <br /> 11 BffUMINOUS CURB 20 LF $ 10.U0 $ 200.00 <br /> 12 SILT FENCE 50 LF $ 5.00 3 250.00 <br /> 13 INLET PROTECTION 1 EA S 300.00 $ 300.00 <br /> 14 ROCK BAG CHECK 40 LF S 8.00 $ 320.00 <br /> 15 SOD 200 SY S 8.00 $ 1,6D0.00 <br /> '!6 EROSION CONTROL BLANKET 40 SY $ 5.00 $ 200.00 <br /> 17 WOOD MULCH 70 SY T 8.00 $ 560.00 <br /> 16 SPRINKLER SYSTEM AND INVISIBLE FENCE REPAIR 1 LUMP SUM $ 1,000.00 S 1,000.00 <br /> TOTAL ESTIMATED CONSTRUCT/ON COST.� $ 91,590.00 <br /> CONTINGENCY-10% $ 9,159.00 <br /> SOFT COSTS-25% $ 22.897.50 <br /> TOTAL ESTIMATED PROJECT COST: $ 123,64fi.50 <br /> cnY ot o�o�,o-cis.�moos <br />
The URL can be used to link to this page
Your browser does not support the video tag.