My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2014 Council Packet
Orono
>
City Council
>
2014
>
01-13-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:19 PM
Creation date
4/3/2015 12:46:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTION 4 <br /> ESTIMATED COSTS <br /> A. PROJECT COST ESTIMATE <br /> The total estimated project cost for Alternate 1, the forcemain, is $123,647. An <br /> itemized cost estimate is provided on Table 1 in the Appendix. This consists of the <br /> estimated construction cost plus a 10 percent allowance for contingencies and a 25 <br /> percent allowance for soft costs. The soft costs include project related engineering, <br /> administrative, legal, �scal and miscellaneous costs. <br /> The total estimated project cost for Alternate 2, the gravity sewer, is $415,207 and is <br /> detailed on Table 2 in the Appendix. This includes a 10 percent allowance for <br /> contingencies and 20 percent allowance fa. soft costs. No specific allowance is <br /> included for easement acquisitions in the project cost for both alternates. <br /> B. FINANCING <br /> The sanitary sewer extension is proposed to be funded by special assessments to the <br /> benefitting properties. It is anticipated that project costs will be initially financed <br /> through the sale of Chapter 429 Improvement Bonds. <br /> The properties benefitting from the proposed sewer extension are the six parcels on <br /> Green Trees Road as shown on Figures 1 and 2. The proposed assessment method is <br /> the unit assessment which assesses like parcels the same amount as each will get equal <br /> benefit. This results in an estimated assessment rate of$20,608 per parcel for Alternate <br /> 1 and of $69,201 per parcel for Alternate 2. The current property and owner <br /> information for the six parcels is provided on the Figures. <br /> C. ADDITIONAL EXPENSES <br /> In addition to the assessment for the cost of the sanitary sewer extensions, each <br /> property receiving sewer service will incur other expenses including, but not limited to <br /> the following: <br /> 1. One-time City of Orono Charges <br /> Connection Charge $ per parcel <br /> This charge is subject to change and is typically adjusted annually. <br /> Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.