My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-13-2014 Council Packet
Orono
>
City Council
>
2014
>
01-13-2014 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2015 4:44:19 PM
Creation date
4/3/2015 12:46:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SUMMARY AND CONCLUSIONS <br /> 1. The preparation of this feasibility study was authorized by the Orono City Council in <br /> response to a petition received which requested extension of municipal sanitary sewer <br /> service to properties on Green Trees Road. <br /> 2. The study proposes two alternates for extending sewer from the existing gravity sewer on <br /> the east side of Shoreline Drive. Alternate 1 proposes a 2-inch forcemain and Alternate 2 <br /> proposes an 8-inch gravity sewer. Both alternates are proposed to be constructed by use <br /> of trenchless construction methods. The sewer extensions are shown on Figures 1 and 2 <br /> in the Appendix. <br /> 3. The existing sanitary sewer system has adequate capacity to accommodate the proposed <br /> extension. <br /> 4. The total estimated project cost is $123,647 for Alternate 1 and $415,207 for Alternate 2 <br /> which include allowances for contingencies and soft costs. <br /> 5. The project cost is proposed to be funded by Special Assessment to the six properties on <br /> Green Trees Road that will benefit from the sewer extension. The estimated assessment <br /> rate is $20,608 per parcel for Alternate 1 and $69,201 per parcel for Alternate 2. <br /> 6. In addition to the ass�ssment for the sewer extension, each parcel connecting to the sewer <br /> will be subject to one-time Orono and MCES connection/sewer availability charges and <br /> costs for abandoning the existing onsite sewer systems and for the service connection <br /> from the house to the service stub. <br /> 7. Both improvement alternates proposed within are feasible from a technical perspective. <br /> Alternate 1 is significantly lower in cost. The advantage offered by Alternate 2 is gravity <br /> sewer service is provided to each parcel which is typical for the majority of the sewer <br /> connections in Orono. The gravity service eliminates the need for a grinder pump station <br /> on each Iot which is required for Alternate 1 to pump sewage into the forcemain. <br /> Page 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.