My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01-26-2015 Council Work Session Packet
Orono
>
City Council
>
1950-2024
>
1999-2016 work sessions
>
2015
>
01-26-2015 Council Work Session Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2019 2:02:59 PM
Creation date
4/3/2015 11:03:51 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
� Zoning Ordinance & City Code Review 2015 <br /> � I Land Use Equivalency <br /> i <br /> Factor <br /> �Single-Family Residential 5-Acre Zonel Z 0.8 <br /> �Single-Family Residential 2-Acre Zone3 1.0 <br /> ,Single-Family Residential 1-Acre Zone 1.3 <br /> Single-Family Residential �/z-Acre Zone 1.5 <br /> !Multifamily Residential 4 Units/Acre or Less 1.8 <br /> � <br /> I�Multifamily Residential Greater than 4 Units/Acre 2.1 <br /> Commercial or Industrial 2.4 <br /> 1 Buffer easement reduction. For the five-acre zoning district, a reduction of up to 50 percent of the trunk fee for the lot will be allowed fo�the <br /> percentage of the lot protected by pe�imeter and/or drainageway buffer easements. These bulfer easement areas sha/l remain in a natural condition. <br /> Z Maximum fee. For the five-ac�e zoning district, any/ot exceeding 7.0 gross acres, inc/uding wetland, shall be charged a maximum trunk fee equal to <br /> the trunk fee for a 7.0 acre parce% Such lot shall remain eligible for the up to 50 percent reduction noted in footnote 1, such reduction based on the <br /> pe�centage of 7.0 ac�es that is p/aced in buffer easements, <br /> 3 Maximum fee. Fo�the hvo-acre zoning districts, any lot exceeding 4.0 gross acres, including wet/and, shall be charged a maximum trunk fee equal <br /> to the trunk fee for a 4.0 acre parce% <br /> (d) Payment. All applicable stormwater trunk fee charges set forth in this subdivision shall be paid in full before any building or land alteration <br /> permits are issued for the project. <br /> Sec. 14-284. - New development projects. <br /> New development projects shall pay the base trunk fee per acre of land developed adjusted using the appropriate land use equivalency factor as <br /> set forth in this subdivision. <br /> Sec. 14-285. - Redevelopment projects. <br /> Redevelopment projects shall be defined for the purposes of this subdivision as any project to either remove and replace existing structures or <br /> to enlarge existing structures.These projects will be charged a portion of the base trunk fee adjusted for the area of expansion of impervious surface <br /> above the existing conditions. The table below lists the percentage of the acreage base trunk fee based on the area of impervious surface expansion <br /> and adjusted for the type of land use.The trunk fee shall be determined by multiplying the appropriate fee by the acreage of the development site. <br /> A�ea of Residential Commercial o� <br /> Impervious Development Industrial <br /> Surface 2-Acre Commercial/ <br /> Expansion Single-Family Industrial Base <br /> (square feet) Residential Base Trunk Fee/Acre <br /> � <br /> Trunk Fee/Acre(%) (%) <br /> ��1,000 35 35 <br /> 1,000-2,000 70 70 <br /> More than 2,000 100 100 ( <br /> Sec. 14-286. - Responsibility to supply information. <br /> The owner, occupant or person in charge of the property subject to this subdivision shall supply the city with such information as the city may <br /> reasonably request related to the use, development and area of the property. Willful failure to provide such information or to falsify such information <br /> is a violation of this subdivision. <br /> Sec. 14-287. -Ad'ustment of char es. <br /> Updated 1/23/15 Page 8 of 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.