Laserfiche WebLink
- Zoning Ordinance & City Code Review 2015 <br /> Pages 4 through 6 reflect the amendments to be reviewed by the City Council at the February 9t" meeting; no planning commission public hearing is required. <br /> File i e Current Lanauaae&Pronosed Chanaes Summarv of Chanae/Comments Priori <br /> Number• i n List No. <br /> #15-3711 86-66 Construction Permit Clarifies permit requirements and modifies 25 <br /> (Doesn't Required. updated full survey requirements for minor <br /> require � permits Required. building and site grading permits by allowing a <br /> Planning It is unlawful for any person to erect, construct, enlarge, alter, repair, move, improve, remove, convert, or demolish any building or structure, or site plan. <br /> Commissio any part or portion, including but not limited to the general construction, plumbing, ava�er�vel�on-site sewage treatment system, wood stoves <br /> n Hearing and fireplaces, ventilating, heating or air conditioning systems, or cause such work to be done, without first obtaining a separate building, septicF PC supported modifying the requirements <br /> or siqn" or general permit for each such building, structure or separate component from the city. to allow a site plan when an existing <br /> Recommen survey is on file for small additions,decks, <br /> d) � Zoning Permit for Landscaping_ grading work, etc. They felt it was very <br /> If a landscapina plan is not submitted with the survey or site plan and incorporated as part of the buildingpermit approval, including the name �mportant, however,to make sure the <br /> of the landscape contractor, then a separate zoning permit application shall be submitted by the landscaping contractor prior to performing anx language does not allow this for new <br /> landscaping work on a property, including, gradinq, patios and retaining walls. The zoningpermit for landscaping shall be reviewed and homes or complete reconstructs. <br /> approved by the ci prior to issuance of a permit. <br /> Permit application; information required. <br /> a)The application for a construction permit shall include such information as may be required by the city, which may vary between types of <br /> construction projects. <br /> 86-68 (b) Surveys or site plan required: <br /> (Not w/in <br /> Zoning (1) Initialsurveyorsite plan,Any building or general permit application for construction of a new structure or expansion of an existing <br /> Code. structure shall be accompanied by a certificate of survey or site plan drawn to scale prepared by a person registered by the Minnesota <br /> Doesn't Board of Architecture, Engineering, Land Surveying, Landscape Architecture, and Interior Design, unless specifically exempted by the citv. <br /> require PC An initial certificate of survey shall be reauired for new home construction or sites with a complete reconstruction of a structure. A <br /> Hearing) <br /> certificate of survey or site plan shall conform to the City of Orono Survey or Site Plan Requirements. ^����'�-�'� �� °:'� `� �"� ��`:�� �F�"� <br /> �+�it�-e�e+a�. <br /> #15-3712 DIVISION 2 CONSTRUC7'ION PERMIT Clarifies language for exterior building 29 <br /> 86-70 Sec. 86-70. - Permit expiration. completion based upon legal precedent. <br /> (Not w/in (a) Notwithstanding continuing or ongoing work, any building permit issued by the city shall expire and by limitation be null and void and shall <br /> Zoning require issuance of a new permit and payment of half the original permit fee if a certificate of occupancy and final completion has not been PC was supportive of the revision <br /> Code. issued within the following length of time afiter the date of permit issuance, which new permit and fee shall be necessary to reimburse the city <br /> Doesn't for ongoing and more than normal number and cost of inspection services: <br /> require PC (1) Single-family residential dwellings, including new construction, remodeling or additions, 24 months. <br /> Hearing) �2� Accessory buildings on single-family residential properties, 12 months. <br /> (3) All multifamily and nonresidential construction, 24 months, except when a longer time is authorized by the council at the time the original <br /> permit is issued. <br /> (b) Notwithstanding continuing or ongoing work nor issuance of new or extended permits, all exterior work authorized by a buildingpermit issued <br /> in accordance with the State Building Code shall be completed within twelve (12) months following issuance of the buildingpermit. <br /> : In addition, <br /> {� no land shall remain disturbed and exposed without established grass or other ground cover according to the a�proved grading and <br /> landscapingplans for a-�e�ied-ej�g the same twelve (12) month ep riod. . <br /> � � � � , <br /> �7 .... ..FM,. ,.F�I�.,. „F...+,.F,. ..,.F...,+:,... <br /> (c) Failure to complete such exterior construction and grading/landscaping improvements shall result in the expiration st�s�e�ie�t of the existing <br /> permit. . <br /> , • <br /> Updated 1/23/15 Page 4 of 10 <br />