My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2015 Council Packet
Orono
>
City Council
>
2015
>
03-09-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2015 3:18:37 PM
Creation date
4/2/2015 3:18:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> Monday,March 9,2015 <br /> 7:00 o'clock p.m. <br /> (14. BALDUR PARK ENGINEERING SERVICES,continued) <br /> McMillan stated Orono is pretty good at having natural speed bumps all through the City and that the City <br /> does periodically receive requests for speed bumps due to speed concerns. McMillan stated the City had <br /> speed bumps installed in one area on Crystal Bay Road and that the residents had issues with them due to <br /> the noise and vibration. McMillan stated she personally finds it hard to drive fast on Baldur Park Road <br /> but that other people might not feel the same way. McMillan stated keeping the road narrow will help. <br /> Printup moved,Walsh seconded,to direct Bolton&Menk,Inc.,to commence survey testing and <br /> design for the Baldur Park Road reconstruction project. VOTE: Ayes 5,Nays 0. <br /> 15. NAVARRE STREET LIGHT AND SIDEWALK PROJECT—PAY REQUEST NO.5 <br /> Edwards stated before the Council tonight is Pay Request No. 5 for the Navarre streetlight and sidewalk <br /> project. Edwards stated the Navarre streetlight and sidewalk project is almost complete with the <br /> exception of some punch list items that will be completed in the spring. <br /> Walsh stated he wants to make sure enough money is retained to cover the punch list items. <br /> Edwards stated there is,and that the few punch list items include some minor sidewalk corrections, <br /> removal of some banner hangers on a light pole and a couple of other small items. <br /> Walsh asked how much those items would amount to. <br /> Edwards stated it probably amounts to$5,000 to$6,000 and that the City will be retaining$11,000. <br /> Walsh moved,Cornick seconded,to approve Pay Request No.5 for the contractor MP Technologies <br /> in the amount of$17,040.29 for the Navarre Street Light and Sidewalk Project. VOTE: Ayes 5, <br /> Nays 0. <br /> *16. 2014 SANITARY SEWER REHABILITATION AND MANHOLE LINING—PAY <br /> REQUEST NO. 1 <br /> Levang moved,Cornick seconded,to approve Pay Request No. 1 for the contractor Insituform in <br /> the amount of$176,770.21 for the 2014 Sanitary Sewer Rehabilitation&Manhole Lining Project. <br /> VOTE: Ayes 5,Nays 0. <br /> 17. CYGNET AND CHEVY CHASE PARK STATUS <br /> Printup stated he does not necessarily have a problem with changing the status on these two areas,but that <br /> in the Comprehensive Plan it is labeled as undesignated open space. Printup stated the only concern he <br /> had was whether there is the potential for future development if the City changes the designation of a <br /> park. Printup noted he is speaking generally and not necessarily for these two parks. <br /> Walsh stated it comes down to what are the consequences of doing this going into the future. <br /> Page 37 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.