My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-09-2015 Council Packet
Orono
>
City Council
>
2015
>
03-09-2015 Council Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/2/2015 3:18:37 PM
Creation date
4/2/2015 3:18:00 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
488
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MINUTES OF THE <br /> ORONO CITY COUNCIL MEETING <br /> Monday,March 9,2015 <br /> 7:00 o'clock p.m. <br /> (13. WATERTOWN ROAD AND STUBBS BAY ROAD,continued) <br /> Printup moved,Levang seconded,to approve the project design for Watertown Road and Stubbs <br /> Bay Road and to authorize the solicitation of bids. <br /> Walsh asked if there is a timeline for the project. <br /> Martini indicated they are still waiting for comments back from MN/DOT,which they are hoping to <br /> receive by the end of next week. Once MN/DOT signs off on the project,then they will authorize the <br /> City to advertise for bids. Martini stated once the project is advertised,it is usually three weeks from the <br /> first ad to the bid opening. The best case scenario is the second meeting in April or possibly the first <br /> meeting in May. <br /> Walsh asked if the ad could also be included in the Blue Book,which is distributed free to contractors. <br /> Martini stated he would need to obtain that information from Council Member Walsh but that they could <br /> include the ad in there as well. <br /> T'here were no public comments on this item. <br /> VOTE: Ayes 5,Nays 0. <br /> 14. BALDUR PARK ENGINEERING SERVICES <br /> Edwards stated the proposal before the Council tonight is for engineering services. There is a not to <br /> exceed fee that Bolton&Menk has proposed to do for the preliminary engineering up through design and <br /> bid on this project. Edwards stated he would request the Council authorize Bolton&Menk to perform <br /> that work. Edwards stated once that preliminary work is completed of the conditions on the site,he <br /> would bring it back to the City Council before the final design work is started. <br /> McMillan asked how many soil borings are anticipated on Baldur Park Road. <br /> Martini stated four soil borings should be adequate and that they are attempting to determine how much <br /> asphalt is there as well as the base. Martini stated one of the questions they are addressing is whether <br /> they will need to start from the sub-base as well as how much pavement and aggregate exist on the <br /> roadway. <br /> McMillan asked if they are talking about starting from North Shore and reconstructing the entire road. <br /> Martini indicated they are. <br /> McMillan noted the manhole on the far north of the road has experienced quite a bit of heaving and asked <br /> what that is related to. <br /> Martini indicated that is likely due to the subgrade holding water. Martini stated they will need to look at <br /> ways to shed the water but that it will be challenging due to the elevation of the road and the high water <br /> table. <br /> Page 35 of 43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.