Laserfiche WebLink
� <br /> A grid-connected Grid-ConneCted Systems <br /> wind turbine <br /> can reduce your <br /> consumption of <br /> utility-supplied <br /> electricity. <br /> , � AC <br /> yy�� Load <br /> turbine <br /> E <br /> � <br /> r <br /> � <br /> 0 <br /> following information about utility Most of North America gets more <br /> grid connection requirements was wind in the winter than in the sum- <br /> taken from AWEA's Web site.For mer.For people using wind energy to <br /> more detailed information,visit www. displace a large load in the summer <br /> awea.org/or contact AWEA(see For like air-rnnditioning or irrigation <br /> More Information). water pumping,having an annual <br /> Net Metering NEG credit allows them to produce <br /> NEG in the winter and be credited in <br /> The concept of net metering programs �e summer. <br /> is to allow the electric meters of cus- <br /> tomers with generating faalities to Safety Requirements <br /> tum backwards when their generators Whether or not your wind turbine <br /> are producing more energy than the is mnnected to the utility grid,the <br /> customers'demand.Net metering installation and operation of the wind <br /> allows customers to use their genera- turbine is probably subject to the <br /> tion to offset their consumption over electrical codes that your local gov- <br /> the entire billing period,not just emment(city or rnunty),or in some <br /> instantaneously.This offset would instances your state government,has <br /> enable customers with generating in place.The govemmenYs prinapal <br /> faalities to receive retail prices for mncem is with the safety of the <br /> more of the electricity they generate. facility,so these code requirements <br /> Net metering varies by state and emphasize proper wiring and installa- <br /> by utility company,depending on �ion and the use of mmponents <br /> whether net metering was legis- �t have been certified for fire and <br /> lated or directed by the Public Utility electrical safety by approved testing <br /> Commission.Net metering programs laboratories,such as Underwriters <br /> all specify a way to handle the net Laboratories.Most local electrical <br /> excess generation(NEG)in terms of �des requirements are based on <br /> payment for electricity and/or length �e National Electrical Code(NEC), <br /> of time allowed for NEG credit.If ti'��is published by the National <br /> the net metering requirements define Fire Pmtection Association.As of <br /> NEG on a monthly basis,the consum- 1999,the latest version of the NEC did <br /> er can only get credit for their excess not have any sections specific to the <br /> that month.But if the net metering �stallation of wind energy facilities' <br /> rules allow for annual NEG,the NEG consequently wind energy installa- <br /> credit can be carried for up to a yeaz. hons are governed by the generic <br /> provisions of the NEC. <br />